Office Safety Procedure for Workplace Safety Management

The purpose of this office hse procedure is to ensure that all offices are designed to mitigate risk and maintained to ensure the safety of staff and visitors. This office safety procedure is applicable for all kind of head/corporate/admin offices including project site offices to maintain good construction safety culture. Overall the office/project manager is… Read More »

Road Maintenance Standard Requirements During Defect Liability Period

The road maintenance contractor shall be responsible for undertaking all routine maintenance of the existing road and all bridges on the road from the day the road is officially handed-over to the client until the issue of Defects Liability Certificate by the engineer. Contractor shall also carry out all the routine maintenance of the completed… Read More »

Excavation Work Guidelines for Irrigation and Water Supply Projects

This excavation method statement serves as a guideline for the excavation works undertaken during the construction project. The process will include methods to carry out the excavation and surface preparation, in compliance with the applicable environmental and safety measures. Construction manager is responsible in ensuring the implementation of construction procedure and method statement, supervising the… Read More »

Step Ladder Safety Procedure & Control Measures for Safe Work

A ladder is a simple, versatile and relatively inexpensive piece of equipment to use on a construction project or at home level. The temptation therefore is to use it for all sorts or work without considering whether the risk warrants an alternative method of work before it is used for this purpose. However, the circumstances… Read More »

Fixing of Non Swell Type Water Stop in Sub Structure Concrete Works

Purpose of this method statement is to define the fixing of the water stop in the sub structure concrete works as per the manufacturer’s requirements and drawings, considering all the necessary safety and quality aspects of the work activities. Project manager shall ensure that the water stop works are carried out in accordance with company… Read More »

Concrete Bulging Repair Method Statement

This civil method statement details general procedures to be followed for repairing work of concrete bulging elements by using a suitable material i.e. BASF’s Emaco S88C T. The method covers preparatory works, bulging repairs and curing. The scope of this civil work method statement is for rectification of the bulges in concrete in which chipping… Read More »

Download Electrical Risk Assessment for Project Electrical Works – Editable Formats for 44 Activities

Now you can download electrical Risk Assessments for Electrical Works in editable doc formats. These risk assessments are helpful for project HSE officers for any type of construction projects. These are mandatory requirements for attaching with each of the electrical method statement. You only need to insert few details like project name, company name and… Read More »

Fire Stop Work Installation & Application Method Statement

Scope: This method statement covers the installation of Hilti Fire stop Wok which is also applicable for any other brand of fire stop system by integrating their specific requirements for effective fire stop application. References:  Approved Project Quality Plan Approved Project HSE Plan Approved Material Management Plan Material approval for Fire stop work Technical Literature… Read More »