General Sequence of Works in Preparation of Building Foundation Up To The Level Of Blinding Concrete

The purpose of this article is to define the procedure for sequence of works in preparation for the foundation up to the level of blinding concrete, considering all safety and quality requirements. Preparation of foundation works at site involves water proofing, screed

2020
May
12

Aluminium HVAC Duct Installation Method Statement

Below is a brief method statement that covers the duct installation of aluminium ductwork on a construction project. This procedure defines the method used to ensure hvac aluminium ducting installation has been carried out as per contract requirements and best industry practices.

2020
May
6

Possible Causes of Road Crack and Defect – Road Maintenance Inspection Guide

Possible Cause of Road Crack and Defect - Road Maintenance Inspection Guide

Below you can find some major causes of road crack and road defects. The page also provides what are the effects if these road defects are not properly addressed. Alligator Cracking Alligator cracking is a series of interconnecting cracks creating interconnected patterns

2020
Apr
30

Steel Structure Building Construction Procedure

Steel Structure Building Construction Procedure

This procedure is useful for building construction based upon the steel structure erection work. Based on the design and specification, this document provides a proper step wise procedure and quality and safety management of the steel structure work. The following items/equipments are

2020
Apr
24

Road Pavement Construction Inspection Checklist

Road Pavement Construction Inspection Checklist

General road construction site inspection checks: Contractor has all necessary permits to work in road where applicable, i.e. Construction Permit, Insurance, Bonding etc. available. Safety to public considered: (barricades, covered walkways, etc. provided) Barricades available around excavations in street. Barricades available around

2020
Apr
17

Aluminium Cutter Machine Operation Work Instructions

Aluminium Cutter Machine Operation Work Instructions

This page provides you steps for using the aluminium cutter machine. The instructions are explained using the images to understand easily. When cutting aluminium profiles, please wear hand gloves, ear muffs and safety glasses. Do not wear any kind of jewelry (rings,

2020
Apr
10

Control of Engineering Documents Procedure for Quality Management System

Control of Engineering Documents Procedure

This procedure describes the requirements on the control of engineering documents. This is an essential document control procedure that ensures all engineering drawings and related technical documents essential for completing the works, including shop drawings by vendors, manufacturers and subcontractors on Projects