Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Method Statement for Wet Mix Macadam (WMM) on Granular Sub Base

Method Statement for Wet Mix Macadam (WMM) on Granular Sub Base

This macadam work method statement covers laying and compacting clean, crushed, graded aggregate and granular materials premixed with water into a dense mass on a prepared Granular Sub base Course to specified lines, grades and cross sections as shown in drawings, subject to a minimum thickness of 75 mm and max. of 200 mm. References […]

Method Statement for Wet Mix Macadam (WMM) on Granular Sub Base Read More »

Civil Engineering Methods, Method Statements, Roadworks
Method Statement for Concrete Sampling and Testing

Method Statement for Concrete Sampling and Testing

This method statement is applicable for collecting samples for concrete before and during concrete pouring activities and doing the standard tests. The aim of this civil works method statement is to provide and maintain effective quality control procedures and to execute the work in compliance to standard and good practice at all stages and activities

Method Statement for Concrete Sampling and Testing Read More »

Civil Engineering Methods, Method Statement for Civil Works, Method Statements, Quality Management
Safe Work Procedure Working near Water or Over Water

Safe Work Procedure Working near Water or Over Water

The purpose of this document is to identify the environment, the activities and the associated risks for working over or near water and define the safety, health and environmental requirements with the aim to eliminate risks, or reduce it to as low as is reasonably practicable. This general procedure applies to all projects which are

Safe Work Procedure Working near Water or Over Water Read More »

Civil Engineering Methods, Method Statements, Occupational Health and Safety, Risk Assessment

Legionella Management & Prevention Plan (LMPP) For LEED & ESTIDAMA Green Building Projects

This document presents the Legionella Management & Prevention Plan (LMPP) for any type of public construction project. Project specific Legionella Prevention Plan (LPP) is prepared as per the LEED/ Estidama Requirement for Livable Buildings: Indoor Environmental Quality Requirement, Legionella Prevention. Normally the requirements are given within the project specifications, and contractor is responsible to develop

Legionella Management & Prevention Plan (LMPP) For LEED & ESTIDAMA Green Building Projects Read More »

Building Management System, HVAC Method Statements, Occupational Health and Safety, Templates
Method Statement for Swimming Pool and Jacuzzi Installation

Method Statement for Swimming Pool and Jacuzzi Installation

This construction methodology for the swimming pool and jacuzzi installation consists of descriptive details and the installation sequence for guiding the employees of a pool installation company. Scope of work covers the supply and installation of the Swimming Pool and Jacuzzi. All materials used are in accordance with contract specifications and shall be submitted for

Method Statement for Swimming Pool and Jacuzzi Installation Read More »

Civil Engineering Methods, Construction Method Statements, Method Statement for Civil Works, Method Statements
Underground Drainage Pipe Installation Method Statement

Underground Drainage Pipe Installation Method Statement

The purpose of this plumbing method statement is to describe the methodology for underground laying of UPVC pipes as per the contract specifications and approved drawings, including the backfilling for the site facilities and to detail the steps to be taken to meet the quality and HSE requirements of the project. Method statement is applicable

Underground Drainage Pipe Installation Method Statement Read More »

Plumbing Method Statements
dewatering in construction well point system

Well Point Dewatering System Method Statement

The purpose of this method statement is to define the procedure for sequence of works for dewatering in construction works at site to complete the excavation from the existing levels down to the formation level considering all safety and quality requirements. This method statement covers dewatering works at construction site having 6 meter basement structure,

Well Point Dewatering System Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements