Method Statements

This is our main category that covers all SWMS related documents. If you visit this page you can access hundreds of safe work method statements either in readable or downloadable formats.
Alternatively you can visit our method statements store that offer more than the method statements i.e. ITP, Checklist, QCP and Risk Assessments all in editable formats.
The documents are ready to submit for client approvals after just adding some references and logos etc.

Underground Drainage Pipe Installation Method Statement

Underground Drainage Pipe Installation Method Statement

The purpose of this plumbing method statement is to describe the methodology for underground laying of UPVC pipes as per the contract specifications and approved drawings, including the backfilling for the site facilities and to detail the steps to be taken to meet the quality and HSE requirements of the project. Method statement is applicable […]

Underground Drainage Pipe Installation Method Statement Read More »

Plumbing Method Statements
dewatering in construction well point system

Well Point Dewatering System Method Statement

The purpose of this method statement is to define the procedure for sequence of works for dewatering in construction works at site to complete the excavation from the existing levels down to the formation level considering all safety and quality requirements. This method statement covers dewatering works at construction site having 6 meter basement structure,

Well Point Dewatering System Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements
HVAC System Volume Control & Fire Damper Installation Method Statement

HVAC System Volume Control & Fire Damper Installation Method Statement

Unless otherwise specified, all the dampers and duct accessories installation shall be according to the approved shop drawings and contract mechanical specifications. Drawings, plans, schematics and diagrams indicate general location and arrangement of ductworks, install the dampers as indicated unless deviations to the layout are approved on coordination drawings. This duct accessories and dampers installation

HVAC System Volume Control & Fire Damper Installation Method Statement Read More »

HVAC Method Statements
Method Statement for Condensate Drain Piping Installation Insulation & Testing (UPVC + GI)

Method Statement for Condensate Drain Piping Installation & Testing (UPVC + GI)

This method statement covers on site installation of all condensate UPVC pipes for fan coils drains and galvanized pipework for AHU drains, including supports, expansion and anchor points for the condensate drainage system and insulation of the galvanized steel and upvc pipework. The mechanical method statement defines the method that will be used to ensure

Method Statement for Condensate Drain Piping Installation & Testing (UPVC + GI) Read More »

Method Statements, Plumbing Method Statements, Pressure Testing, Testing & Commissioning
Method of Statement for Installation of Power / Electrical Bus bar

Method of Statement for Installation of Power / Electrical Bus bar

Busbars installation shall be done in accordance with approved shop drawings and properly coordinated with Site Engineer’s for the exact locations and levels.  Before starting the installation of power electrical busbar following tools shall be arranged: PREPARATION FOR BUS BAR INSTALLATION The marking of the route on site to be carried out prior to commencement

Method of Statement for Installation of Power / Electrical Bus bar Read More »

Electrical Method Statements
Water Leak Detection System Testing & Commissioning Method of Statement

Water Leak Detection System Testing & Commissioning Method of Statement

This testing and commissioning method statement defines the nature and method of Pre-Commissioning & Commissioning of Water Leak Detection System, which has been already installed and approved in the project. However, contractual terms and conditions shall be applied and enforced in case of any contradictory matters that may arise. Purpose of this method is to

Water Leak Detection System Testing & Commissioning Method of Statement Read More »

Building Management System, Electrical Method Statements, Method Statements, Plumbing Method Statements, Testing & Commissioning

Mobile Heavy Equipment Recovery Standard Procedure

The purpose of this procedure is to safely recover mobile equipment that may have been bogged, overturned, suffering from mechanical/structural failure, slipped over an edge or into a culvert, or similarly immobilized. It provides instruction for recovery operations that require the use of heavy mobile recovery equipment, although some of the general safety principles may

Mobile Heavy Equipment Recovery Standard Procedure Read More »