Below is a precise electrical method of statement for installation & testing of Lightning Protection Earthing & Bonding System. The method is very useful for site engineers and electricians to conduct site activities without fail. Arrange following tools before starting the work
Read Complete Method
Method Of Statement For Installation of GI Conduits & Accessories For Electrical Works is given below for the reference of our visitors if you want to use this method statement for your own work or company you can follow the complete method
Read Complete Method
Below is a comprehensive method statement for GI and PVC conduit installation which can be used for purpose of any project and it can be approved easily by consultants because it covers all aspects of a standard conduit installation method. We have also given
Read Complete Method
This page provides a precise method statement for drainage pipe installation which is useful for any kind of project. Below is list of plant & equipment used for the drainage piping installation work: Measuring tape Tool Box Measuring Tape Hack Saw Spirit
Read Complete Method
Cleaning and flushing of chilled water piping system is very important part of any HVAC project. During installation there are many sources from which debris, dusts and even metallic parts enter the system. Before putting the system in operation cleaning and flushing
Read Complete Method
Below method statement is for testing and commissioning of DDC panels and FCU (fan coil units) with respect to building management system BMS. Pre-Commissioning Checks for field Instruments Check installation of all field instruments for correct location and position as instructed in
Read Complete Method
This method statement covers on site installation of pre-fabricated and site fabricated mild steel pipework including supports, expansion and anchor points for chilled water system. This procedure is to define the method used to ensure that the Chilled Water Pipework System installation
Read Complete Method
1. Purpose This Method statement covers the installation and final electrical connections to the MV and LV equipment at any electrical project site. All the electrical installation work will be in accordance with the project electrical specifications. 2. Scope of Work This procedure
Read Complete Method