Below is a standard method statement which can be used as learning purpose and to prepare further professional method statement for testing and commissioning of transformers. Required tools for transformer testing & commissioning. Portable Hand Tools / Tool Box. Digital Multimeter Earth
Read Complete Method
The purpose of this method statement is to define the procedure for Installation, Testing and Commissioning of UPS. Also to ensure that agreed procedures are implemented during execution of the previously described or associated work. Scope of this method statement covers material
Read Complete Method
Below method statement is equally useful for the tiling work on walls and on floors. Both methods are distinguished for easy study of our visitors and for them to understand the procedure of installation of tiles. Method for Tiling at Wall Before
Read Complete Method
1. Purpose This method of statement describes the methodology and procedure of installation of dehumidification unit for the project, and to ensure that all concerned persons are familiar with the sequence of activities, utilization of resources, and execution of the works in
Read Complete Method
Block work is most important work for the construction of any building. Concrete blocks are very common building components that are used worldwide. There is a wide variety of size and type used within the construction industry today. Let us look at some
Read Complete Method
This method statement describes the practices and methods to be used with regards to placing, curing and defect rectification of concrete works & blinding concrete. Prior to the placing of any concrete or concrete pouring all quality checks are to be completed
Read Complete Method
Installation of sub circuit wiring Check the installation & approval of distribution board / back box either recessed or surface and termination of all conduits & trunking completed. Confirm DB reference with load schedule detail. Check all conduits as per circuits are
Read Complete Method
The purpose of this method of statement or standard operating procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of “ Chilled Water Pump” through the guidelines contained herein so as to
Read Complete Method