2014
Aug
12

Installation Procedure For Closed Control Units

The mechanical site engineer / site supervisor will give necessary instructions to tradesmen (pipe fitters & duct installers) and provide necessary approved construction/shop drawings of latest revision along with coordinated layouts for ccu installation works. Following tools shall be required before starting

2014
Aug
12

DOWNLOAD METHOD STATEMENT FOR TESTING & COMMISSIONING OF WATER BOOSTER PUMPS SET

Download Method Statement For TESTING & COMMISSIONING OF BOOSTER PUMPS Now you can Download Method Statement For Booster, Circulation or Filtration Pumps Testing & Commissioning including Pre-Commissioning and Commissioning Checklists The files are in word format and You only need to change

2014
Aug
12

TESTING & COMMISSIONING OF FIRE ALARM SYSTEM

Download Method Statement For TESTING & COMMISSIONING OF FIRE ALARM SYSTEM Now you can Download Method Statement For Fire Alarm System Testing & Commissioning including Pre-Commissioning and Commissioning Checklists The files are in word format and You only need to change project

2014
Mar
29

Electrical Method Of Statement For Installation & Termination of Cables and Wires

This method statement for electrical work shall help you understand the requirements before and during the cable s and wires pulling process. The document is very helpful for MEP QA/QC engineers to develop the professional electrical method statement for their project. Below

2014
Mar
20

Sanitary Fittings / Sanitary Ware Installation Method Statement

If you need to learn the method for installation of sanitary ware fittings, then you can use step wise procedure as per below method statement. Storage of Sanitary Fittings i) Upon completion of receiving QC inspection, segregate the sanitary ware model /

2014
Mar
17

Water Chiller installation method statement

chiller testing method statement

Below is a standard method statement or procedure which can be used for installation of water chiller on its foundation after it is delivered on the sites. Before starting the activity of chiller installation following tools/equipment shall be arranged: Tool Box Lifting Equipment

error: Content is protected !!