Variable Air Volume Installation Testing and Commissioning Method Statement

Variable Air Volume VAV Installation Testing and Commissioning Method Statement

This method Statement shall cover the Supply, Installation, testing and commissioning of VAV Variable Air Volume System in line with project requirements as indicated in the approved HVAC shop drawings, specifications and VAV manufacturer’s instructions. Arrange following tools before starting the VAV

2025
Feb
9

Storage Tank Fabrication Erection and Testing Method Statement

Cathodic Protection System for Storage Tanks Installation Method Statement

This procedure covers detailed activities for fabrication, erection and testing of the storage tanks, and also equipment & manpower required for the same. Storage tank fabrication tasks / activities need to be carried out with utmost care with good workmanship and in

2025
Feb
6

Lifting Work Safety Method Statement

Lifting Work Safety Method Statement

This document covers the procedure to establish a method statement for all lifting activities for any kind of project especially laying of large transmission pipelines. The purpose of this document is to follow proper methodology and to carry out the activities and

2025
Jan
30

GCB Generator Circuit Breaker Installation Method Statement

GCB Generator Circuit Breaker Installation Method Statement

Purpose of this method statement is to define the sequence of GCB generator circuit breaker installation and safe execution of the job. Procedure applies for GCB transportation, handling, and installation at electrical building / roof where these activities will be performed as

2025
Jan
27

Method Statement for Demolition Works

Demolition-Method-Statement

Below is precise method statement for demolition works that has been prepared to demonstrate the safe working method for the soft strip of internal fixtures/fixings and identified items, asbestos removal and demolition of the existing structure. This safework method is to be

2025
Jan
14

METHOD STATEMENT FOR INSTALLATION OF WIRING DEVICES & CEILING ROSE

PURPOSE The purpose of generating this method statement is to define the procedure step by step to implement the correct practices for Installation of Wiring Devices & Ceiling Rose for Electrical System through the guidelines contained herein so as to ensure that

2025
Jan
10

Method Of Statement For Installation Of Fan Coil Units And Packaged Air Conditioning Units

Fan Coil Unit (FCU) Installation Method Statement

Below is mechanical method statement that is prepared in order to make sure that site installation of all types of Fan Coil Units and Packaged Air Conditioning Units and associated refrigerant pipework is done as per applicable requirements and manufacturer instructions. Procedure