2019
Oct
7

Method Statement for Installation of Fire Protection Services

fire protection system

This method statement describes in detail the installation of fire protection services at any project. The procedure covers the following activities that are also supported by the diagrams and illustrations. Fire Protection Riser Pipe Installation Rigid Coupling Installation Mechanical-T Installation Flexible Coupling

2019
Sep
4

Butterfly Valve Installation and Maintenance Procedure

This method is for installation and maintenance of wafer type butterfly valve or lug style butterfly valve with a cast iron body construction, SS stem and disc and either EPDM, BUNA-N or Viton liners. Although the procedure is specifically provided for bi-Torq

2019
Jul
12

Method of Statement For Cast-in Pipeworks (Mild Steel or Ductile Iron)

pipeworks method of statement

This pipeworks procedure is applied to all the cast-in pipeworks (mild steel or ductile iron) for the project site in water treatment facility. The contents or procedures provided in this document are based on the general good water industry practices and manufacturer

2019
Jun
15

Standby Diesel Generator Installation Instructions

standby diesel generator installation instruction

Before the installation of standby generator the equipment shall be inspected and checked against the relevant general arrangement drawing, approved material submittal. Doors and Panels shall be checked to ensure proper opening and closes. Generator rating, name plate details, Breaker ratings, protection