2016
Sep
21

Procedure for Repairing Damaged Outer Jacketing of Cables by Wraparound Heat Shrinkable Sleeves

SCOPE OF WORK: This Method Statement describes the procedure for repairing the damaged outer jacketing of cables using wrap around heat shrinkable sleeves. TOOLS  Cable preparation tools Cable manufacturer approved solvent Clean, lint free clothes Burning Torch Electrician’s tape Installation tools MATERIALS REQUIRED:

2015
Dec
12

Download Method Statement For Testing & Commissioning Of Smoke Management System

Download Method Statement For Testing & Commissioning Of Smoke Management System  Download Package Contains the Method Statement + Checklist for Testing &  Commissioning + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be

2015
Dec
12

Sequence Of Operation For Electrical, Low Current & ELV Systems

Fire Alarm Panels Sequence Location: Fire Alarm Panels: Various Locations (refer to Fire Alarm Layout) Each Fire alarm panel will be monitored by the DDC controller to provide a system healthy, fault and alarm. All information shall be displayed on the BMS Supervisor.

2015
Dec
4

Download Method Statement For Installation Of Light Fittings Luminaries Exterior & Interior

Download Method Statement For Installation Of Light Fittings Luminaries Exterior & Interior  Download Package Contains the Method Statement + Checklist for Installation + Inspection & Testing Plan  You only need to change project name and insert logos etc and the same shall be ready to be submitted for

2015
Oct
6

Testing and Commissioning Procedure For Structured Cabling System SCS

Below is a complete method statement that can be followed for performing testing & commissioning of structured cabling system including voice, telephone and data systems. Copper Cable Testing & Commissioning Method Statement Overview: Characterizing cabling provides useful data for the support of future

2015
Aug
28

Download Method Statement for Disabled Toilet Alarm System DTA Testing & Commissioning

Download Method Statement for Disabled Toilet Alarm System DTA Testing & Commissioning   Download package contains the Method Statement + Checklists for Pre Commissioning + Checklists for Testing & Commissioning + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert

2015
Aug
28

Download Method Statement for Installation of Enclosed switches Isolators

Download Method Statement for Installation of Enclosed switches Isolators  Download package contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready

2015
Aug
28

Download Method Statement for Disabled Toilet Alarm System DTA Installation

Download Method Statement for Disabled Toilet Alarm System DTA Installation   Download package contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready

error: Content is protected !!