2017
Jun
15

Lead Acid Batteries Installation Operating Maintenance Instructions

Before starting the batteries installation begins, inspect for signs of damage or missing components. Store the battery in a dry, clean and preferably cool and frost-free location. Do not expose the cells to direct sunlight as damage to the container and cover

2017
Feb
8

Main Sub-Main Distribution Boards Testing and Commissioning Procedure

distribution board testing procedure

Method Statement For The Testing and Commissioning of Main Sub-Main Distribution Boards (MSMDB) Sub-Main Distribution Boards (SMDB) Distribution Boards (DB) and Consumer Units(CU) TESTING, COMMISSIONING AND START UP PROCEDURES Upon completion of equipment installation and prior to carrying out test runs, the

2017
Feb
8

Main Distribution Board MDB Testing & Commissioning Procedure

main-distribution-board MDB Testing Procedure

Upon completion of the LV Distribution Board installation including proper terminations into each breaker, the same shall be offered up for inspection from consultants. Earth fault loop impedance test & earth leakage test for LV Distribution Board shall be done & recorded

2016
Nov
12

Testing & Commissioning Procedure for Start Up of Diesel Generator Genset

General Requirements Batteries, fuel & auxiliary power must be isolated before carrying out initial inspection. Ensure that the control switch is in the OFF position and emergency switch is pressed. Ensure that the panel has the correct fascia and labels. Note: All test

2016
Sep
29

Structured Telephone & Data Cabling System Testing Requirements

structured cabling system testing requirements

All cables and termination hardware shall be 100% tested for defects in installation and to verify structured cabling system performance under installed conditions according to the requirements of ANSI/TIA 1152, ANSI/TIA-568 C.2 and IS&T. All pairs of each installed cable shall be