RCC Precast Boundary Wall Method Statement

Below is a precise method statement for the rcc precast boundary wall construction and installation as per project specifications and approved drawings. Quality requirements shall be complied during all activities as per project quality plan, specifications and approved method statements. List of Equipment’s Below is list of necessary plant and equipment for precast boundary wall… Read More »

Hydrostatic Testing Procedure Including Pigging, Draining, Swabbing and Drying of Pipelines

The purpose of this hydrostatic testing procedure is to list out various steps involved in hydrostatic pressure testing, pigging, draining, swabbing and drying of pipelines for any kind and size of pipeline project in line with the project specifications and applicable standards and regulations. Scope of work covers the water supply quality and treatment, Internal… Read More »

Automatic Transfer Switch Testing Requirements

As part of the Field Quality Control as per specification clauses, testing and commissioning of the ATS Panel will be carried out as per the approved method statement under the direct supervision of factory authorized service representative. Below are standard ATS testing requirements that shall be considered while doing the electrical testing and commissioning activities.… Read More »

Aluminum Mobile Scaffolds Method of Use Safety Hazards and Risk Assessment

This method provides you guidelines for the safe use of aluminum mobile scaffolds and standard instruction applies to all applications where people are using aluminium mobile scaffold towers. Overall project manager and HSE manager are responsible for the implementation of this standard safety procedure. The use of lightweight aluminium mobile scaffold towers on construction sites… Read More »

Method Statement for Reinforcement Works for Footing, Strap Beam, Raft, Slab & All Structural Concrete – Steel Fixing

The purpose of this method statement for reinforcement works is to lay down the systematic procedures for the various activities required for installation of reinforcement bars to ensure that all works are carried out in accordance with the approved shop drawings, bar bending schedule and project specifications. This method of statement covers the general procedures… Read More »

Welding Method Statement Prerequisites

There are many different welding processes, but the most commonly used in the construction industry are gas welding and electric arc welding. In order to ensure that all welding works takes place in a safe manner, the suitability of the following should be ensured: A-  The Arc welders B-   The working welding equipment C-   The… Read More »

Automatic Transfer Switch & Bypass Isolation Switch Testing & Commissioning

The purpose of this electrical method statement is to outline the sequence & method of Testing & Commissioning of Automatic transfer & Bypass isolation switch. This procedure is to be read in conjunction with relevant ATS operators manual and User’s guide. By following this procedure contractor shall ensure that the method used for testing and… Read More »

Underground Piping Fabrication and Laying Method Statement

Purpose of this mechanical work procedure is to provide guide lines to carry out underground piping fabrication and laying and to ensure that proper quality control and documentation are maintained at project site. The scope of this procedure covers fabrication, installation and relevant inspection for all underground piping works including relevant civil works at the… Read More »