2024
					Mar
					
					
					
					
					
					17
				Embankment Construction Method Statement Including Soil Stabilization & Granular Sub Base
 
		
					Below is a precise roadwork method statement that covers construction of embankment including soil stabilization and sub base preparation, with material obtained from approved borrow areas or suitable material obtained from roadway excavation and drain excavation etc. The embankment construction work shall