Download Method Statement For INSTALLATION & TESTING OF REFRIGERANT PIPING SYSTEM FOR FCU, PACKAGED UNITS CCU ETC. Now you can Download Method Statement, ITP, Installation & Pressure Test Checklists and Risk Assessment For Refrigerant Piping Installation & Pressure Testing. The files are in word/excel format
Read Complete Method
Below is the detailed procedure for the installation of refrigerant piping which can be applicable for any kind of air conditioning works or ac copper pipe. Below is list of necessary tool requirements for installation and testing of refrigerant piping works. Mechanical
Read Complete Method
Below is detailed method statement for testing and commissioning of chiller. All the testing and commissioning work shall be done in accordance with mechanical specification and in accordance with the manufacturer’s instructions. Prior to starting the Chiller all electrical works related to
Read Complete Method
Below is the detailed cable tray installation method statement not only for cable tray but applicable for GI ladder and trunking for indoor and outdoor applications and in service rooms like pump rooms, electrical rooms and plant rooms etc. PREPARATION AND SUBMISSIONS BEFORE
Read Complete Method
Operating Instructions for fire fighting system including sprinkler system, landing valves, hydrant valve, hose reel valve, and extinguishers. I. SPRINKLER SYSTEM Alarm Valve (i) Setting up of an Installation Control Valve assembly. State of Plant: Fire protection system mains pipework charged to
Read Complete Method
Maintenance Instructions for the maintenance of Fire Sprinkler, Stand Pipe, Hydrant & Hose Reel Systems including fire fighting pump sets. Maintenance Of Sprinkler System: Installation of Control Valve (Alarm Valve) It is recommended that the Alarm Valve be inspected periodically to ensure proper operation.
Read Complete Method