2013
Sep
2

Method Statement For Fire Alarm System Installation & Testing

Below is the method statement for the installation of fire alarm system which can be modified for different type of systems like HSSD or Vesda etc. The steps are very general and should be customized depending upon the project specific requirements, specifications

2013
Aug
29

Method Statement For Installation & Testing of Sanitary Fittings / Plumbing Fixtures

Method Statement For Installation & Testing of Sanitary Fittings & Fixtures

Below is the brief Method Statement For Installation & Testing of Sanitary fittings / plumbing wares / Accessories / Plumbing Fixtures etc. This method of statement is very useful for any kind of construction project. The procedure is simple and covers all

2013
Aug
20

Testing & Commissioning Of Fire Suppression System

The scope of method statements covers the planning, preparation, and conduct of fire suppression systems cable laying, Installation testing and commissioning. Preparation & Pre Testing & Commissioning Work Before start of testing & commissioning the completeness of the system shall be ensured

2013
Aug
13

Welding Method Statement Prerequisites

There are many different welding processes, but the most commonly used in the construction industry are gas welding and electric arc welding. In order to ensure that all welding works takes place in a safe manner, the suitability of the following should be

2013
Aug
13

Installation Of Reinforcement Steel Bars For Footing, Strap Beam, Raft, Slab & All Structural Concrete – Steel Fixing

Installation Of Reinforcement Steel Bars For Footing, Strap Beam, Raft, Slab & All Structural Concrete - Steel Fixing

The purpose of this method statement is to lay down the systematic procedures for the various activities required for reinforcement bars to ensure that all works are carried out in accordance with the approved shop drawings and project specification. This method of

2013
Aug
1

Method Statement For Installation Testing & Commissioning Of BMS Building Management System

Installation Testing & Commissioning Of BMS Building Management System

Scope of Work This method statement is applicable for Installation, Testing & Commissioning of BMS building management system in accordance with the specified standards and regulations in project specifications. The Scope of works includes the delivery to site, installation, testing & commissioning of

2013
Jul
31

Chilled Water Balancing For HVAC System Method Statement

The aim of chilled water balancing is to apply a disciplined procedure of adjustment to water flow rates throughout the chw system to meet the particular requirements of the design. The balancing of chilled water flow rates should be carried out to specified

error: Content is protected !!