2013
Aug
13

Welding Method Statement Prerequisites

There are many different welding processes, but the most commonly used in the construction industry are gas welding and electric arc welding. In order to ensure that all welding works takes place in a safe manner, the suitability of the following should be

2013
Aug
13

Installation Of Reinforcement Steel Bars For Footing, Strap Beam, Raft, Slab & All Structural Concrete – Steel Fixing

Installation Of Reinforcement Steel Bars For Footing, Strap Beam, Raft, Slab & All Structural Concrete - Steel Fixing

The purpose of this method statement is to lay down the systematic procedures for the various activities required for reinforcement bars to ensure that all works are carried out in accordance with the approved shop drawings and project specification. This method of

2013
Aug
1

Method Statement For Installation Testing & Commissioning Of BMS Building Management System

Installation Testing & Commissioning Of BMS Building Management System

Scope of Work This method statement is applicable for Installation, Testing & Commissioning of BMS building management system in accordance with the specified standards and regulations in project specifications. The Scope of works includes the delivery to site, installation, testing & commissioning of

2013
Jul
31

Chilled Water Balancing For HVAC System Method Statement

The aim of chilled water balancing is to apply a disciplined procedure of adjustment to water flow rates throughout the chw system to meet the particular requirements of the design. The balancing of chilled water flow rates should be carried out to specified

2013
Jul
31

Air Balancing Procedure for HVAC System FCU AHU Exhaust Fans & Pressurization Unit

Air Balancing Procedure for HVAC System FCU AHU Exhaust Fans & Pressurization Unit

Below is a precise air balancing procedure that covers the HVAC system equipment and ducting system.  Air Balancing For Fan Coil Units Check that all automatic controls are fully commissioned and operating properly All pre-commissioning checks have been carried out Select the

2013
Jul
31

Inspection Checklists / Forms For Electrical Works Installation Testing & Commissioning

Below are the links for downloading the sample inspection and testing check sheets and forms which you can use for conducting the inspection of different electrical systems and activities. You can make your own forms based upon the information given here. Please

2013
Jul
31

Sample Forms & Checklists For HVAC Installation Testing & Commissioning

You can download the sample forms and checklists for different activities which you can then reuse and customize as per your requirements. Below we have given list of checklists which you can download in one go by clicking the download link given

2013
Jul
30

Flushing Procedure For Chilled Water System & Chemical Treatment

Flushing Procedure For Chilled Water System

Chilled water or cooling water system is mostly a closed system that requires strict monitoring and control of certain parameters. Water during circulation evaporates and it increases the suspended particle concentration, which in result creates scale formation and corrosion etc. Therefore the

error: Content is protected !!