MV Switchgear Installation Method Statement

This method statement for installation of medium and low voltage switchgear and panels boards on site is prepared to define the method used to ensure that all MV/LV switchgear and panels site assembly, installation, final connection and workmanship is correct and acceptable and conforms to the contract documents & electrical specifications. The Project Manager is […]

MV Switchgear Installation Method Statement Read More »

Electrical Method Statements
Embankment Construction Method Statement Including Soil Stabilization & Granular Sub Base

Embankment Construction Method Statement Including Soil Stabilization & Granular Sub Base

Below is a precise roadwork method statement that covers construction of embankment including soil stabilization and sub base preparation, with material obtained from approved borrow areas or suitable material obtained from roadway excavation and drain excavation etc. The embankment construction work shall be preformed in compliance with, contract agreement, Ministry of Road Transport & Highway

Embankment Construction Method Statement Including Soil Stabilization & Granular Sub Base Read More »

Roadworks

Piping Installation, Welding & Fabrication Method Statement

TABLE OF CONTENTS PURPOSE SCOPE REFERENCES DEFINITIONS RESOURCES RESPONSIBILITIES SEQUNCE OF WORKS QA/QC REQUIREMENTS HSE REQUIMENTS EMERANCY CONTACTS Purpose: The purpose of this methodology is to provide a systematic control and direction for the activity for the installation of piping at a construction site. This method statement provides the expectation to execute work in safe,

Piping Installation, Welding & Fabrication Method Statement Read More »

HVAC Method Statements, Steel Structure & Fabrication
standby diesel generator installation instruction

Generator Installation Method Statement Including Fuel Tank Installation at High Level

This method statement covers the generator and fuel tank installation for any kind of project. Prior to commencement of the works, all activities shall be coordinated with Project Safety Officer and PTW holder, who will assess the associated risks, and monitor the implementation of the work as per the Project Safety Plan and liaise with

Generator Installation Method Statement Including Fuel Tank Installation at High Level Read More »

Electrical Method Statements
Mass (Ribbon) Fusion Splicing

Termination of Fiber Optic Cables

This fiber optic installation method statement covers the termination of fiber optic cables with patch panel, network distribution cabinet NDC and door junction box but can be applicable for any kind of network installations. Roles and Responsibilities: The electrical manager shall be responsible for the overall implementation of this method statement, and to ensure that

Termination of Fiber Optic Cables Read More »

Building Management System, Electrical Method Statements