Fixing of Non Swell Type Water Stop in Sub Structure Concrete Works

Purpose of this method statement is to define the fixing of the water stop in the sub structure concrete works as per the manufacturer’s requirements and drawings, considering all the necessary safety and quality aspects of the work activities. Project manager shall ensure that the water stop works are carried out in accordance with company […]

Fixing of Non Swell Type Water Stop in Sub Structure Concrete Works Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements
Concrete Bulging Repair Method Statement

Concrete Bulging Repair Method Statement

This civil method statement details general procedures to be followed for repairing work of concrete bulging elements by using a suitable material i.e. BASF’s Emaco S88C T. The method covers preparatory works, bulging repairs and curing. The scope of this civil work method statement is for rectification of the bulges in concrete in which chipping

Concrete Bulging Repair Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Method Statements
Sample page of Electrical Risk Assessment for Project Electrical Works

Download Electrical Risk Assessment for Project Electrical Works – Editable Formats for 44 Activities

Now you can download electrical Risk Assessments for Electrical Works in editable doc formats. These risk assessments are helpful for project HSE officers for any type of construction projects. These are mandatory requirements for attaching with each of the electrical method statement. You only need to insert few details like project name, company name and

Download Electrical Risk Assessment for Project Electrical Works – Editable Formats for 44 Activities Read More »

Occupational Health and Safety, Risk Assessment
Method Statement for Installation of Fire Stop Work

Fire Stop Work Installation & Application Method Statement

Scope: This method statement covers the installation of Hilti Fire stop Wok which is also applicable for any other brand of fire stop system by integrating their specific requirements for effective fire stop application. References:  Approved Project Quality Plan Approved Project HSE Plan Approved Material Management Plan Material approval for Fire stop work Technical Literature

Fire Stop Work Installation & Application Method Statement Read More »

Civil Engineering Methods, Construction Method Statements, Fire Suppression System, Method Statement for Civil Works
Sample Job Description of Construction Project MEP Coordinator

Sample Job Description of Construction Project Best MEP Coordinator

Below is a sample job description for the role of M&E or MEP project coordinator. There can be additional roles and responsibilities depending upon the structure and size of the organization. MEP project coordinator normally is appointed by main contractor who looks after the coordination works of different subcontractors and main contractor. He works in

Sample Job Description of Construction Project Best MEP Coordinator Read More »

Project Planning, Quality Management

Method of Statement for Good Housekeeping in Construction Site

This standard document provides guidance on how to maintain a tidy place of work, free from avoidable hazards and an orderly working environment. Scope of the procedure covers all projects under the supervision of the organization. Project head along with discipline engineers including HSE are overall responsible for the implementation of this housekeeping method. Good

Method of Statement for Good Housekeeping in Construction Site Read More »

Construction Method Statements, Method Statements, Occupational Health and Safety