Aluminium HVAC Ductwork Installation Method Statement

Below is a brief method statement that covers the duct installation of aluminium ductwork on a construction project. This procedure defines the method used to ensure hvac aluminium ducting installation has been carried out as per contract requirements and best industry practices.

2025
Aug
18

Ductwork and Accessories Installation Method Statement

Ductwork & Accessories Installation Method Statement

Ducts in any HVAC system are used for distribution of air which can be for the purpose of cooling, providing fresh air or for the exhaust purpose. Commonly the HVAC ductwork is fabricated using GI sheets, but there are different types of

2025
Aug
15

Chilled Water Pumps Testing & Commissioning

Below is a precise testing and commissioning method statement for chilled water pumps on a project site. The purpose of this method of statement or standard operating procedure is to define the step by step method to implement the correct practices for

2025
Aug
14

Method Statement for Drainage Pipe Installation – PVC uPVC Drainage Piping Under / Above Ground

This method statement is applicable for all drainage pipe works underground, above ground, horizontal and vertical drainage piping for any kind of the project as specified in project specification. It is responsibility of project manager and project plumbing engineer to ensure the

2025
Aug
14

Nitrogen Flushing of Air Conditioning and Refrigeration Systems

Below is the standard procedure for the proper flushing of air-conditioning and refrigeration system with the use of dry nitrogen, and refrigeration equipment which require flushing of the system after exposing it to the atmosphere or during replacement of the refrigerant compressor. Responsibilities: 

2025
Aug
12

Concrete Formwork Method Statement

Concrete Formwork Method Statement

The purpose of this document is to lay down the systematic procedures for the various activities required for concrete formwork to ensure that all works are carried out in accordance with the approved shop drawings and contract specifications. This civil method statement