Testing, Commissioning, Training, Handover and DLP Strategy for a Project

Testing & Commissioning Testing & commissioning is done once all civil & MEP system installation is completed, inspected and approved. Before starting the T&C activities a comprehensive testing & commissioning plan is prepared and approval is taken from client/consultant. It is discussed

2016
Aug
6

AC Duct Cleaning Method Statement Best for HVAC Ducts & Accessories

AC Duct Cleaning Method Statement for HVAC Ducts & Accessories

The purpose of this ac duct cleaning method is to remove the inert suspended matter such as foreign objects, moulds etc. HVAC duct cleaning will be done until all suspended matter and loose debris are fully removed from the ducting system. Following

2016
Jul
8

Testing & Commissioning Procedure for Ventilation and General Exhaust Fans

Mechanical Pre-commissioning checks for Exhaust Fans Carefully inspect the unit and check the installation with anti vibration materials is complete. Check and ensure the shipping bolts / clamps are removed. Check tightness of all nuts / bolts, screws, fasteners etc. as applicable. Check the

2016
Jul
8

Download Method Statement For Testing & Commissioning of Exhaust & Ventilation Fans

Download Method Statement For Testing & Commissioning of Exhaust & Ventilation Fans  Download Package Contains the Method Statement + Inspection & Testing Plan + Checklists for Pre Commissioning  + Checklists For Testing & Commissioning You only need to change project name and insert logos etc

2016
May
11

Download Method Statement For Internal Painting Works

Download Method Statement For Internal Painting Works  Download Package Contains the Method Statement + Checklists for Painting + Inspection & Testing Plan + Risk Assessment  You only need to change project name and insert logos etc and the same shall be ready to be submitted for

2016
May
11

Internal Painting Method Statement

This method statement details general procedures to be followed for the internal painting work using paints from Berger at any kind of a project/building. The procedure covers preparatory works, actual application and area cleaning associated with the painting works. For Latex Emulsion

2016
May
9

Method Statement For Repairing Screed Surface

Following equipment shall be arranged: Hand tools Air Compressor Wire brush Slow speed drill with Fosroc MR4 mortar mixing paddle Finishing Sponge & rubber gloves SURFACE PREPARATION Mark out the defective area, remove loose sand cement materials and all contamination from screed

2016
May
3

Method Statement For Damaged Cracked Concrete Repair Of Large Cracks

Damaged Cracked Concrete Repair Of Large Cracks

This procedure shall apply to the repair of all defective cracked concrete in large quantities, using high strength, free flowing, cementitious micro concrete  of size 40 – 300 mm thickness. Concrete Preparation The areas to be repaired are to be as shown

error: Content is protected !!