Concrete Blocks are mostly used building material in all parts of the world. Below is a brief method statement that you can utilize for concrete blocks laying alignment & jointing. Blockwork is major activity that requires precise alignment and joining because if
Read Complete Method
The purpose of this method statement is to outline the sequence & method of Testing & Commissioning of Automatic transfer & Bypass isolation switch. This procedure is to be read in conjunction with relevant operators Manual and User’s guide. This procedure ensures the
Read Complete Method
Before starting the site installation work domestic water treatment system, ensure all civil works are completed for the area of installation, and civil clearance is obtained from respective authorities to proceed further. Prior to start the installation, refer to the approved shop
Read Complete Method
Electric installation and maintenance work may be carried out only by appropriately qualified licensed electricians. Mains connections must be hard-wired. Please ensure full compliance with all applicable national and international rules and regulations concerning electric connections, as well as all applicable safety
Read Complete Method
Pre-Commissioning Procedure Before starting the commissioning activities check and ensure that bypass Terminal Reheat units are installed as per the approved shop drawings and manufacturer’s instructions and approved. Check that sensing grids tubing connection from the grids to the transducers are correct
Read Complete Method
Before starting the batteries installation begins, inspect for signs of damage or missing components. Store the battery in a dry, clean and preferably cool and frost-free location. Do not expose the cells to direct sunlight as damage to the container and cover
Read Complete Method
Below is a precise and comprehensive method statement for water tank installation (GRP Water Tank). The water tank installation shall be carried out by specialist contractor based on the following steps and shall be done in accordance with the approved shop drawings,
Read Complete Method
Prior to installation of uPVC High Pressure Water Supply Piping System, the supervisor and foreman will verify and ensure that all the safety requirements have been complied with and are in place. The supervisor will verify that all relevant approved latest revisions of
Read Complete Method