Temporary Electrical Supply HSE Procedure For Construction Site

Below procedure will help you to establish a safe standard for the installation of temporary and permanent electrical fixtures/appliances on project sites. Overhead Cables: Overhead supply from the supply point or metering point to the distribution boards on the site should be of

2018
Dec
9

Plunge Column Construction Method Statement

PURPOSE This Method Statement describes the construction process of 1500 mm diameter Plunge columns construction in the project. SCOPE OF WORK The scope of work and the construction sequence for installation of permanent plunge column shall be as mentioned below: Traffic Management

2018
Dec
6

Construction QA/QC Quality Manager & Engineer Job Description

Project job descriptions for different job titles are prepared and implemented as part of a good quality management system. Before start of a project normally organization chart is prepared and submitted for the approval of the client and consultant. Some clients provide

error: Content is protected !!