The purpose of this method statement is to illustrate how the existing fence and shelters will be removed from site in proper and safe way. The scope of this method of statement is to cover the demolishing methodology of the following: Chain
Read Complete Method
Quality Assurance (QA) refers to the process used to create the deliverables, and can be performed by a manager, client, or even a third-party reviewer. Examples of quality assurance include management procedures, process checklists, project audits and methodology and standards development. Quality
Read Complete Method
Strainers are installed to prevent foreign matter e.g. scale and dirt causing damage to pipeline equipment. Service temperature and pressure indicated on the identification plate or body marking should not be exceeded. Crane strainers have not been designed as fire safe pressure
Read Complete Method
Every project requires that basic first aid kit is always available for the purpose of emergency use. First aid is the initial and immediate help given to a sick or injured person until full medical treatment is available. In order to give
Read Complete Method
Below is list of very informative terms and definitions which are related to the formwork scaffolding. Every health and safety person must get familiar about these terminologies. ALIGNER Lumber or metal members used to align vertical formwork. (plumbing strut or alignment device)
Read Complete Method
Below you can know about 12 project management steps. Normally these are the project steps that serve as a basis for making a complete project plan. If we expand each project steps further we may need lot of details. Ultimately you will
Read Complete Method
Below are detailed health and safety procedures for GRP pipeline installation and lamination works. The chemical components required for the butt-strap joints of GRP pipes present certain safety and health hazards if not handled well. Following are the recommendations: Common Hazards: Resin: Liquid
Read Complete Method
This Procedure defines the work method for Installation and lamination of GRP Pipe for the project. The purpose of this procedure is to set out the requirements and methods for Installation of GRP Pipeline including the lamination in detail. This procedure shall
Read Complete Method