The purpose of this method statement is to ensure pollution free environment by proper disposal of chemical waste that are hazardous to health of personnel. The procedure is applicable to all personnel involved in processing of photosensitive film and handling of chemicals.
Read Complete Method
This document is for the use of employees and its subcontractors, who are responsible in operations of instruments using ionising radiation. This document covers specific instructions on how to safely perform radiography related task. Please note that this method is general and
Read Complete Method
Quality control of construction materials and product is an essential requirement for obtaining improved and uniform standard of road construction. Quality Control is an essential part of any production process and highway constructions are no exception. The need for quality control on
Read Complete Method
A project site was used as a case study mainly to highlight the importance of anticipating the presence of hard materials on site and the associated problems if hard materials are detected during construction work. The study was undertaken alongside the remained
Read Complete Method
Below is a brief method statement for road markings and road signs. The method will ensure the quality of work in accordance with the contract requirements and applicable local standards. Following this road work method statement will also ensure that all quality
Read Complete Method
Below asphalt paving method statement describes the responsibilities of personnel, execution procedure, safety factors and mandatory documents for the work. The overall responsibility lies with the project manager but specifically relevant function heads are responsible for controlling the asphalt paving work quality
Read Complete Method
A lift plan must be provided to the client/consultant for review and approval, prior to performing any lifting operations. The lift plan must include: The type, size, model, lifting capacity, certification date and serial number of the crane to be used. A
Read Complete Method
Below is a brief paving method statement that is useful for interlocking blocks, interlocking bricks and interlocking tiles paving works. Following is list of necessary resources, equipment and tools for doing the block paving works. Theodolite/dumpy level leveling staff loader plate/roller compactor
Read Complete Method