2019
Oct
22

Pipe Jacking Method Statement Using Automatic Tunneling Machine

Pipe Jacking Method Statement Using Automatic Tunneling Machine

The objective of this method statement is to define the installation sequence of casing pipe by means of Pipe Jacking using Herrenknecht Automatic Tunneling Machine with Slurry Material Removal (AVN machines). Table of Content Soil investigation. Identification and location of existing utilities.

2019
Oct
7

Method Statement for Installation of Fire Protection Services

fire protection system

This method statement describes in detail the installation of fire protection services at any project. The procedure covers the following activities that are also supported by the diagrams and illustrations. Fire Protection Riser Pipe Installation Rigid Coupling Installation Mechanical-T Installation Flexible Coupling

2019
Sep
4

Butterfly Valve Installation and Maintenance Procedure

This method is for installation and maintenance of wafer type butterfly valve or lug style butterfly valve with a cast iron body construction, SS stem and disc and either EPDM, BUNA-N or Viton liners. Although the procedure is specifically provided for bi-Torq

2019
Aug
28

Download Construction Project Risk Assessment – Covering 40 Activities

Construction Project Risk Assessment

Now you can download the full package of editable construction project risk assessment for any type of civil project works. This covers 40 activities that are involved in most of the civil construction projects. Each project risk assessment file contains the details

error: Content is protected !!