Construction Project Management Review TQM Procedure

Reviewing the performance of any project or organization is key to its success and growth. This is best practice to conduct management review meetings for agenda of continuous improvement. Any organization that implements total quality management or TQM on their processes and

2020
Sep
30

Water Supply Piping Installation Method Statement – HDPE, uPVC, Copper & PPR Pipes

This plumbing method of statement covers the installation of domestic water supply piping and accessories. The procedure defines the method to ensure the installation work is done as per contract requirements, specifications and best practices. It gives details of how to carry

2020
Jul
29

Method Statement for Preparation and Construction Of Cast In Place Concrete Works for Substructures

The purpose of this civil work method statement is to define the procedure for the preparation and construction of Cast in Place Concrete Works for substructures in accordance with the requirements specified in the relevant specifications, procedures and drawings, considering safety and

2020
Jun
30

Pile Cutting & Trimming Method Statement

The purpose of this Method Statement is to define the procedure for the cutting of piles to the approved cut off level. General sequence of work may include: Auger fitted with appropriate head Auger drilled into ground to required depth. Steel reinforcement

2020
Jun
24

Project Approvals – Statutory and Regulatory Requirements for Construction Projects

project approvals procedure for construction projects

This procedure describes the requirements on statutory approvals to ensure all necessary regulatory and statutory project approvals are obtained in a timely manner to support engineering activities, construction activities and project completion etc. The process related to statutory/regulatory project approvals is described

2020
Jun
5

General Sequence of Works in Preparation of Building Foundation Up To The Level Of Blinding Concrete

The purpose of this article is to define the procedure for sequence of works in preparation for the foundation up to the level of blinding concrete, considering all safety and quality requirements. Preparation of foundation works at site involves water proofing, screed

2020
May
12

Aluminium HVAC Duct Installation Method Statement

Below is a brief method statement that covers the duct installation of aluminium ductwork on a construction project. This procedure defines the method used to ensure hvac aluminium ducting installation has been carried out as per contract requirements and best industry practices.

2020
May
6

Possible Causes of Road Crack and Defect – Road Maintenance Inspection Guide

Possible Cause of Road Crack and Defect - Road Maintenance Inspection Guide

Below you can find some major causes of road crack and road defects. The page also provides what are the effects if these road defects are not properly addressed. Alligator Cracking Alligator cracking is a series of interconnecting cracks creating interconnected patterns