Exhaust Fan & Ventilation Fan Installation Procedure Including Accessories

This method statement covers the fan installation including accessories. The procedure defines the method used to ensure the exhaust fan installation has been carried out as per project contract requirements and best practices. It also gives details of how the mechanical work

2022
Sep
28

Bored Pile (Cast-in-Situ) Construction Method Statement

Bored Pile (Cast-in-Situ) Construction Method Statement

The purpose of this document is to outline the proposed methodology for the construction of the cast-in-situ bored piles using temporary casings. Aim of the procedure is to detail the sequence and method of pile construction, identify the hazard, assess the associated

2022
Sep
8

Precast Post Tensioned Beam Installation Procedure

This civil method statement is prepared to state the proposed construction method for prestressing works and shall be, upon approval by the consulting engineer, distributed to all parties concerned so that the prestressing works can be carried out with the same information.

2022
Aug
31

Painting Standard Specifications for Enamel & Emulsion Painting Techniques

All paints to be used shall be those supplied by approved manufacturers. The quality of paints shall comply with MS 125 in respect of oil/ enamel paints and MS 134 in respect of emulsion paints/acrylic paint. Prior to commencement of the painting

2022
Aug
21

Underground Fuel Tank Back Filling and Cathodic Protection Installation Procedure

Cathodic Protection System for Storage Tanks Installation Method Statement

Below is a brief method statement for Fuel Oil System, that covers the backfilling and cathodic protection of underground pressure vessel / fuel storage tank. Overall project manager is responsible for the implementation of project quality and safety requirements and achieving the

2022
Aug
2

Installation Method Statement for Water Feature Piping Equipment and Accessories

jointing procedure using solvent cement

Below is a brief method statement that covers installation of water feature equipment’s and accessories, in accordance with project specifications and manufacturer’s installations. MEP project manager, engineers site supervisors shall have overall responsibility for adherence to the approved method statement, project quality

2022
Jul
9

Method Statement for Structured Cabling System Installation

Method Statement for Structured Cabling System Installation

This method of statement covers the nature and type of work for structured cabling installation as per approved material submittal and site requirements for the construction project. Method statement also covers frequency of which the inspections are to be carried out. Any

2022
Jul
3

Sprinkler System Installation Procedure

Pre-construction meeting will take place to brief all requirements on the implementation of this firefighting method statement. All operatives will attend the Project Safety induction prior to commencing work on site. As a minimum requirement, daily toolbox talk will explain and discuss: