The purpose of this plumbing method statement is to describe the methodology for underground laying of UPVC pipes as per the contract specifications and approved drawings, including the backfilling for the site facilities and to detail the steps to be taken to
Read Complete Method
The purpose of this method statement is to define the procedure for sequence of works for dewatering in construction works at site to complete the excavation from the existing levels down to the formation level considering all safety and quality requirements. This
Read Complete Method
The purpose of this Method Statement is to illustrate how plastering work is to be carried out with safework implementation. Plastering method statement defines the methodology of all kind of plastering works related to a construction project covering the main contractor works.
Read Complete Method
The purpose of this method statement is to make sure that hydrostatic pressure testing of chilled water piping system is done safely as per client requirements and applicable mechanical standards. Method statement covers the hydrostatic testing of chilled water steel pipework at
Read Complete Method
This construction safety instruction provides two-fold direction to assist in preventing children from entering the construction / mining site and being exposed to harm and to prevent underage personnel from working on the project. Procedure is applicable for all kind of projects
Read Complete Method
Unless otherwise specified, all the dampers and duct accessories installation shall be according to the approved shop drawings and contract mechanical specifications. Drawings, plans, schematics and diagrams indicate general location and arrangement of ductworks, install the dampers as indicated unless deviations to
Read Complete Method
This method statement covers on site installation of all condensate UPVC pipes for fan coils drains and galvanized pipework for AHU drains, including supports, expansion and anchor points for the condensate drainage system and insulation of the galvanized steel and upvc pipework.
Read Complete Method
Busbars installation shall be done in accordance with approved shop drawings and properly coordinated with Site Engineer’s for the exact locations and levels. Before starting the installation of power electrical busbar following tools shall be arranged: Tower Crane / Fork Lift for
Read Complete Method