Testing & Commissioning

Lightning Surge Protection Earthing & Bonding System Installation Method Statement

Below is a precise electrical method statement for installation & testing of lightning electrical surge protection, earthing and bonding System. The method is very useful for site engineers and electricians to conduct site activities without fail and in order to achieve project best quality targets. Overall project manager is responsible for the implementation of this […]

Lightning Surge Protection Earthing & Bonding System Installation Method Statement Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning

BMS System Testing & Commissioning for DDC Panel and FCU

Below method statement is for testing and commissioning of DDC panels and FCU (fan coil units) with respect to building management system BMS. Pre-Commissioning Checks for field Instruments Check installation of all field instruments for correct location and position as instructed in the installation details of each instrument as well as instructions from supplier. Check

BMS System Testing & Commissioning for DDC Panel and FCU Read More »

Building Management System, HVAC Method Statements, Method Statements, Testing & Commissioning

Chilled Water Pump Testing & Commissioning Method Statement

Below is a precise testing and commissioning method statement for chilled water pumps on a project site. The purpose of this method of statement or standard operating procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of CHW chilled water pumps. By following the guidelines

Chilled Water Pump Testing & Commissioning Method Statement Read More »

HVAC Method Statements, Method Statements, Testing & Commissioning
Chilled Water Pressurization Unit Testing & Commissioning Method Statement

Chilled Water Pressurization Unit Testing & Commissioning Method Statement

Purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of chilled water pressurization unit through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function to the satisfactory level of

Chilled Water Pressurization Unit Testing & Commissioning Method Statement Read More »

HVAC Method Statements, Method Statements, Testing & Commissioning

Transformer Testing & Commissioning Method Statement

Below is a standard electrical method statement which can be used as reference to prepare further detailed method statement for testing and commissioning of transformers. Below is list of necessary tools for transformer testing & commissioning. Portable Hand Tools / Tool Box. Digital Multimeter Earth Resistance Tester Megger Tester. Safety requirements tools such as safety

Transformer Testing & Commissioning Method Statement Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning
Pan Tilt & Zoom or PTZ CCTV Camera

CCTV Testing and Commissioning Method Statement

Below is a precise cctv testing and commissioning method statement, the objectives of the process of testing and commissioning of CCTV camera is to verify proper functioning of the equipment’s and system after installation. Also to ensure the performance of the installed cctv system meets the specified design intent through a series of tests and adjustments.

CCTV Testing and Commissioning Method Statement Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning
Hydrostatic Testing Procedure Including Pigging, Draining, Swabbing and Drying of Pipelines

Hydrostatic Testing Procedure Including Pigging, Draining, Swabbing and Drying of Pipelines

The purpose of this hydrostatic testing procedure is to list out various steps involved in hydrostatic pressure testing, pigging, draining, swabbing and drying of pipelines for any kind and size of pipeline project in line with the project specifications and applicable standards and regulations. Scope of work covers the water supply quality and treatment, Internal

Hydrostatic Testing Procedure Including Pigging, Draining, Swabbing and Drying of Pipelines Read More »

Method Statements, Piping Works, Plumbing Method Statements, Pressure Testing, Testing & Commissioning
Automatic Transfer Switch Testing Requirements

Automatic Transfer Switch Testing Requirements

As part of the Field Quality Control as per specification clauses, testing and commissioning of the ATS Panel will be carried out as per the approved method statement under the direct supervision of factory authorized service representative. Below are standard ATS testing requirements that shall be considered while doing the electrical testing and commissioning activities.

Automatic Transfer Switch Testing Requirements Read More »

Electrical Method Statements, Method Statements, Testing & Commissioning