Category Archives: Pressure Testing

Piping Work Method For Fuel Oil Pipe Fabrication Installation and Testing

The scope of this document is to describe the basic methods which shall be adopted for installation and testing of Fuel Oil Piping (ASME B31.9,”Building Services Piping”). This document also details the tools & tackles, manpower and Inspection and Test plans, to meet the requirements of applicable codes and client’s project specifications for pipe fabrication… Read More »

uPVC High Pressure Water Supply Piping System Installation Procedure

Prior to installation of uPVC High Pressure Water Supply Piping System, the supervisor and foreman will verify and ensure that all the safety requirements have been complied with and are in place. The supervisor will verify that all relevant approved latest revisions of shop drawings, technical submittals, inspection and test plans are in the work place… Read More »

Method Statement For Installation & Testing Of Laboratory Gas System, Accessories & Fittings

Download Method Statement For Installation & Testing Of Laboratory Gas System, Accessories & Fittings  Download Package Contains the Method Statement + Checklists for Installation + Checklists for Testing + Inspection & Testing Plan + Risk Assessment    You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval… Read More »

Download Method Statement For Installation & Testing Of Vacuum System

Download Method Statement For Installation & Testing Of Vacuum System  Download Package Contains the Method Statement + Checklist for Installation + Checklist for Testing & Commissioning + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below… Read More »

Download Method Statement For Installation & Testing of Water Supply Piping System

Download Method Statement For Installation & Testing of Domestic Cold and Hot water supply Piping System and Accessories For Above & Below Ground Installations  Download package contains the Method Statement + Checklist for Under Ground Piping Installation + Checklist for Above Ground Piping Installation + Hydro Pressure Test Report + Inspection & Testing Plan +  Risk Assessment   You only… Read More »

Refrigerant Piping Installation and Pressure Testing Method of Statement

Below is the detailed procedure for the installation of refrigerant piping which can be applicable for any kind of air conditioning works or ac copper pipe. Below is list of necessary tool requirements for installation and testing of refrigerant piping works. Mechanical Tool Box Sandpaper or Sand cloth Wire brush Testing Tools Nitrogen cylinder Soldering… Read More »