Piping Method Statements

Method Statement for Hydrostatic Testing of Metallic Pipework

The purpose of this method statement is to make sure that hydrostatic pressure testing of chilled water piping system is done safely as per client requirements and applicable mechanical standards. Method statement covers the hydrostatic testing of chilled water steel pipework at the project and to be followed for all piping works at site. Prior […]

Method Statement for Hydrostatic Testing of Metallic Pipework Read More »

Construction Method Statements, Method Statements, Piping Method Statements, Plumbing Method Statements, Pressure Testing, Testing & Commissioning
Method Statement For Installation Of Stainless Steel Shower Gullies and Drain Outlets

Method Statement For Installation Of Stainless Steel Shower Gullies and Drain Outlets

This plumbing method statement covers the nature and type of work for drainage outlets stainless steel shower gullies for the project as per site requirements. Method statement also covers frequency of which inspections are to be carried out. All documentary requirements for the installation works will be submitted for approval of consultant and this will

Method Statement For Installation Of Stainless Steel Shower Gullies and Drain Outlets Read More »

Construction Method Statements, Method Statements, Piping Method Statements, Plumbing Method Statements

Piping Work Method For Fuel Oil Pipe Fabrication Installation and Testing

The scope of this document is to describe the basic methods which shall be adopted for installation and testing of Fuel Oil Piping (ASME B31.9,”Building Services Piping”). This document also details the tools & tackles, manpower and Inspection and Test plans, to meet the requirements of applicable codes and client’s project specifications for pipe fabrication

Piping Work Method For Fuel Oil Pipe Fabrication Installation and Testing Read More »

Method Statements, Piping Method Statements, Pressure Testing, Stainless Steel Fabrication, Templates, Test Reports & Forms
medical gas piping system method of statement

Method statement for the Installation of Medical Gases System in Hospital Project

This method statement covers the installation of medical gases system horizontal and vertical piping installations through all the areas in the hospital project. The medical gas pipes shall run horizontally in the main routing in the corridors. The vertical running will be through the pipes drops to the medical gases outlets, bed head units and

Method statement for the Installation of Medical Gases System in Hospital Project Read More »

Method Statements, Piping Method Statements, Plumbing Method Statements
pipeworks method of statement

Method of Statement For Cast-in Pipeworks (Mild Steel or Ductile Iron)

This pipeworks procedure is applied to all the cast-in pipeworks (mild steel or ductile iron) for the project site in water treatment facility. The contents or procedures provided in this document are based on the general good water industry practices and manufacturer standard recommendation. The installation work contractor shall follow this procedures strictly unless otherwise

Method of Statement For Cast-in Pipeworks (Mild Steel or Ductile Iron) Read More »

Method Statements, Piping Method Statements, Plumbing Method Statements

Drainage Pipe Installation & Hydrostatic Testing Method of Statement

When off loading, the drainage pipe shall be lowered to the ground either manually or with crane. Timber supports of at least 3” wide shall be placed beneath the pipes with spacing not greater than 2 mtrs. Closer supports will be required for sizes below 160mm. Drainage pipes shall not be stored under direct sunlight

Drainage Pipe Installation & Hydrostatic Testing Method of Statement Read More »

Construction Method Statements, Method Statements, Piping Method Statements, Plumbing Method Statements