Category Archives: Plumbing Method Statements

Fire Pump Installation Method Statement

Below is a precise method statement for fire pump installation, each project will have its own specific method of statement for installation of fire pump. Follow the manufacturer’s instructions while installing the fire pump. Pump shall be stored on a flat surface in well-ventilated storage area. Inlet and outlet flange blanks shall not be removed… Read More »

Water Spray Firefighting System Installation Method Statement

Below you can find steps for installing the water spray firefighting and fire suppression system. The method statement covers all necessary parts and accessories for the spray system. Following tools shall be arranged before starting the job: Water Spray Nozzle – High Velocity Deluge Valve, OS & Y Valve Electrical Devices Pipe Wrenches Hammer Chisel… Read More »

Condensate Water Filter Installation Method Statement

The Condensate Water Filter (Side Stream/ Multimedia) are compact filtration packages for the removal of grit, airborne particles and scale from cooling tower water in order to avoid system fouling. A licensed and/or trained/experienced plant electrician and millwright-pipe fitter should install this packaged system. Ensure that the concrete pad is level and structurally sound to… Read More »

Method Statement For Installation & Testing Of Laboratory Gas System, Accessories & Fittings

Download Method Statement For Installation & Testing Of Laboratory Gas System, Accessories & Fittings  Download Package Contains the Method Statement + Checklists for Installation + Checklists for Testing + Inspection & Testing Plan + Risk Assessment    You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval… Read More »

Download Method Statement For Installation Of GRP Pipes & Fittings

Download Method Statement For Installation Of GRP Pipes & Fittings  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment    You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list of files that… Read More »

Download Method Statement For Installation Of Plumbing Fixtures, Sanitary Wares & Accessories

Download Method Statement For Installation Of Plumbing Fixtures, Sanitary Wares & Accessories  Download Package Contains the Method Statement + Checklists for Installation + Inspection & Testing Plan + Risk Assessment    You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients. Below is the list… Read More »