The Download package contains:
- Method Statement
- Checklist for Installation
- Risk Assessment
- Inspection & Testing Plan
You only need to change project name and insert logos etc. and the same shall be ready to be submitted for approval from consultant/clients.
Below is the list of files that are included in download package.

