Category Archives: Plumbing Method Statements

How to Install Drainage Pipe System?

Below procedure for installation of drainage pipe is very useful for all kind of projects and buildings of any size. First step is the procurement of pipes after which these shall be delivered on the site. When off-loading, pipes shall be lowered to the ground either manually or with crane. Timber support of at least… Read More »

Fire Fighting Piping System Installation Method Statement

Below is a detailed method of statement for the installation of firefighting piping system. Before starting the work and implementing the fire fighting pipe installation method statement make sure all relevant drawings and details are approved and available for the site team. Necessary materials: Sprinkler pipes to ASTM A536 GR `B’ Zone Control Valve Test… Read More »

UV Sterilization System Testing and Commissioning Method Statement

Ultraviolet UV Sterilization System are useful in many water purification systems to disinfect and control bacteria. Ultraviolet or UV energy is found in the electromagnetic spectrum between visible light and x-rays and can best be described as invisible radiation. UV light occurs with a wavelength ranging from 200 to 390 nanometers (nm). The most effective… Read More »

Cartridge Filters UV Sterilization Unit and Chlorine Dosing System Installation

Before starting the site installation work domestic water treatment system, ensure all civil works are completed for the area of installation, and civil clearance is obtained from respective authorities to proceed further. Prior to start the installation, refer to the approved shop drawings and BOQ related to the area of installation and ensure that required… Read More »

Method Statement for Water Tank Installation – GRP Water Tank

Below is a precise and comprehensive method statement for water tank installation (GRP Water Tank). The water tank installation shall be carried out by specialist contractor based on the following steps and shall be done in accordance with the approved shop drawings, specifications and approved material submittal. Installation contractor shall properly coordinate with the civil… Read More »

uPVC High Pressure Water Supply Piping System Installation Procedure

Prior to installation of uPVC High Pressure Water Supply Piping System, the supervisor and foreman will verify and ensure that all the safety requirements have been complied with and are in place. The supervisor will verify that all relevant approved latest revisions of shop drawings, technical submittals, inspection and test plans are in the work place… Read More »