Category Archives: Plumbing Method Statements

Room Integrity Test For Fire Suppression System FM-200 Inergen Vesda Novec

The objective of this document is to ensure that the room integrity tests in the 200 Bar gas fire extinguishing protected rooms are carried out correctly. FM200 room integrity test will ascertain, whether the room will retain the design concentration of the FM 200 or Inert fire suppression gas for a period of 10 minutes.… Read More »

DOWNLOAD METHOD STATEMENT FOR TESTING & COMMISSIONING OF WATER BOOSTER PUMPS SET

Download Method Statement For TESTING & COMMISSIONING OF BOOSTER PUMPS Now you can Download Method Statement For Booster, Circulation or Filtration Pumps Testing & Commissioning including Pre-Commissioning and Commissioning Checklists The files are in word format and You only need to change project name and insert logos etc and the same shall be ready to… Read More »

Testing & Commissioning Of Fire Pumps

Fire Pump Testing and Commissioning Procedure The purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of “Fire Pumps” through the guidelines contained herein so as to ensure that the job execution complies with the project requirements and serves the intended function… Read More »

Method Statement for Installation of Electric Water Heater

The procedures for the installation and fixing of electric water heater with supports and accessories shall be done as per the manufacturer’s recommended guidelines and installation instructions and as per the approved water supply drawings/layouts and detailed drawing as follows. This method statement for installation of electric water heater must be changed as per site… Read More »

Installation Method Statement Of HDPE Piping

Below is a classic method statement for the installation of HDPE piping network or domestic water supply system. Any plumbing engineer can get benefit from below method of statement for submission to consultant for a construction project. Material received at site shall be inspected and stored according to manufacturer recommendations. Store the hdpe piping material… Read More »

Installation & Leakage Testing Method Statement of Drainage Piping

This page provides a precise method statement for drainage pipe installation which is useful for any kind of project. Below is list of plant & equipment used for the drainage piping installation work: Measuring tape Tool Box Measuring Tape Hack Saw Spirit Level Excavator. Roller/Plate Compactor HDPE Butt Weld/Electro Fusion Weld Machine During transportation pipes… Read More »

Construction Method Statement For Installation of Chilled Water Piping System

This method statement covers on site installation of pre-fabricated and site fabricated mild steel pipework including supports, expansion and anchor points for chilled water system. This procedure is to define the method used to ensure that the Chilled Water Pipework System installation is as per project requirements. System comprises all pipes, tubes, valves, fittings, reducers,… Read More »

Method Statement for Drainage Pipe Installation – PVC uPVC Drainage Piping Under / Above Ground

This method statement is applicable for all drainage pipe works underground, above ground, horizontal and vertical drainage piping for any kind of the project as specified in project specification. It is responsibility of project manager and project plumbing engineer to ensure the availability of coordinated drawings and the required materials as per the project specifications.… Read More »