Transformer Installation Method of Statement for any type of Project

This method statement explains and covers the transformer installation & inspection procedure of cast resin Transformers, although it is applicable for any other type as well. Transformer is used to transform the high voltage powers to low voltages, so that it is

2013
Oct
17

Installation, Testing & Flushing Of Firefighting Piping System

Purpose & Scope The purpose of this method statement is to ensure that correct materials & equipment are used and agreed procedures are implemented during fabrication, installation, testing and flushing of firefighting piping sprinkler system. This method statement specifies the sequence and methodology to be

2013
Oct
6

Testing & Commissioning Of CCTV Camera – Method Statement

The objectives of the process of testing and commissioning of CCTV camera is to verify proper functioning of the equipments and system after installation, and to ensure the performance of the installed system meets the specified design intent through a series of tests and adjustments. Finally to

2013
Sep
30

Installation of Access Control System Method of Statement

This method statement provides steps for the installation of access control security system in order for operatives to understand the work to be executed, how it is to be executed while making references to other technical standards and relevant national/international standards. Method statement covers

2013
Sep
30

Method Statement For Installation Of CCTV Camera Security System

Method Statement For Installation Of CCTV Camera Security System

The purpose of this method statement is to provide guidelines and steps for the cctv installation of security systems by describing the Work to be executed, how it is to be executed and making references to other technical standards and relevant national/international

2013
Sep
7

Sample Checklist for Pre Commissioning Of Chilled Water Pump

The pump operation is controlled as per the chilled water or cooling requirements and sequence of operation is automated via field control devices i.e. valves, thermometers and pressure switches etc. Pump sets are supplied mounted on a substantial fabricated base plate; the

2013
Sep
2

Method Statement For Fire Alarm System Installation & Testing

Below is the method statement for the installation of fire alarm system which can be modified for different type of systems like HSSD or Vesda etc. The steps are very general and should be customized depending upon the project specific requirements, specifications