A precise chilled water pipe insulation procedure is given below: Check all required approved chilled water pipe insulation materials are readily available on site. Install the pipe insulation according to this method statement, taking into consideration the manufacturer instructions as per material
Read Complete Method
Below method statement is equally useful for the tiling work on walls and on floors. Both methods are distinguished for easy study of our visitors and for them to understand the procedure of installation of tiles. Method for Tiling at Wall Before
Read Complete Method
If you are willing to submit a project hse plan then this page is designed in order to provide you an overview of the components of a project HSE plan. The hse or safety plan is a very important document created at
Read Complete Method
What is a bms system or Building Management System, in fact bms is a microprocessor & computer based control system which is now installed in most of the buildings in order to control and monitor the installed equipment including all mechanical and
Read Complete Method
1. Purpose This method of statement describes the methodology and procedure of installation of dehumidification unit for the project, and to ensure that all concerned persons are familiar with the sequence of activities, utilization of resources, and execution of the works in
Read Complete Method
Block work is most important work for the construction of any building. Concrete blocks are very common building components that are used worldwide. There is a wide variety of size and type used within the construction industry today. Let us look at some
Read Complete Method
This method statement describes the practices and methods to be used with regards to placing, curing and defect rectification of concrete works & blinding concrete. Prior to the placing of any concrete or concrete pouring all quality checks are to be completed
Read Complete Method
Installation of sub circuit wiring Check the installation & approval of distribution board / back box either recessed or surface and termination of all conduits & trunking completed. Confirm DB reference with load schedule detail. Check all conduits as per circuits are
Read Complete Method