Constant Air volume Air Conditioning System  Air Handling Units AHU’s The unit shall consist of: Supply Side Intake motorized damper Panel (Pleated) Filter Bag Filter Cooling Coil Supply Fan (with VFD) Plate Heat Exchanger Intake and discharge attenuators Wrap Around heat Pipe

2015
Dec
6

METHOD STATEMENT FOR TESTING AND COMMISSIONING OF LABORATORY AIR FLOW CONTROL SYSTEM & VENTURI VALVES

METHOD STATEMENT FOR TESTING AND COMMISSIONING OF LABORATORY AIR FLOW CONTROL SYSTEM & VENTURI VALVES  Download Package Contains the Method Statement + Checklists for Testing & Commissioning + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert

2015
Dec
4

Method Statement For Chilled Water Cleaning Flushing & Chemical Treatment

Method Statement For Chilled Water Cleaning Flushing & Chemical Treatment  Download Package Contains the Method Statement + Checklists for Cleaning, Flushing & Passivation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same

2015
Dec
4

Download Method Statement For Installation Of Light Fittings Luminaries Exterior & Interior

Download Method Statement For Installation Of Light Fittings Luminaries Exterior & Interior  Download Package Contains the Method Statement + Checklist for Installation + Inspection & Testing Plan  You only need to change project name and insert logos etc and the same shall be ready to be submitted for

2015
Dec
4

Sequence of Installation for the Chiller Plant Manager CPM Field Devices

Sequence of Installation for the Chiller Plant Manager Field Devices Safety All site safety rules & regulations shall be complied with. Supervisors will deliver tool box talks, relevant to these activities to all operatives involved in the installation and shall be recorded.

2015
Dec
3

Download Method Statement For Installation Of Field Devices for Chiller Plant Manager

Download Method Statement For Installation Of Field Devices for Chiller Plant Manager  Download Package Contains the Method Statement + Checklist for Installation + Inspection & Testing Plan + Risk Assessment You only need to change project name and insert logos etc and the same shall be

2015
Nov
25

Download Method Statement For Domestic Water Piping System & Water Tank Sterilization

Download Method Statement For Domestic Water Piping  System & Water Tank Sterilization  Download Package Contains the Method Statement + Checklist for Sterilization + Inspection & Testing Plan  You only need to change project name and insert logos etc and the same shall be ready to be

2015
Nov
25

Download Method Statement For Installation & Testing Of Vacuum System