Pressure Vessel is briefly is a storage device, which could store fluids above 15PSI. These are generally designed based on ASME codes, if vessel does not have heating mechanism(unlike boilers), it can be designed by ASME Section VIII. For PVs with pressure
Read Complete Method
On this page you can find typical project organization chart and job descriptions of the project team. The job descriptions include: Project Manager Senior Project Engineer Architectural Coordination Engineer Planning Engineer Quantity Surveyor Safety Officer Quality Control Engineer Structural Engineer Civil Engineer
Read Complete Method
This method statement describes the procedures for Soft landscaping works which includes planting media, & Planting. Following equipment’s & materials shall be arranged before start of the work: Sweet soil Compost Fertilizers Plants Hand trowel Wheel barrow Tree stakes Tree ties Bobcat Shovel
Read Complete Method
This method is applicable for all fixed, transportable and mobile machinery and equipment used in the building, construction and earthworks activities of the company. Where plant resource is required on the projects, plant department will be contacted to provide equipment or services.
Read Complete Method
This procedure describes the requirements on the forward planning for the completion of a project to ensure that a coherent completion plan is developed well in advance of the end of a project. This then ensures that all activities associated with the
Read Complete Method
1. Design and Selection of Process Control & Instrumentation System should include: Suitability, Reliability, Quality, Accuracy, and Repeatability. a) True b) False c) None 2. Sour Gas can be used in lieu of Instrument Air. a) True b) False c) None 3.
Read Complete Method
Only approved material shall be used. Delivered material shall be stored at stores and shall always be subject to client’s representative inspection. Special shaded pipe racks shall be constructed to store pipes. Fittings and irrigation materials shall be stored inside containers that
Read Complete Method
The aim of this Method Statement is to provide and maintain effective quality control procedures and to execute the work in compliance to standard and good practice at all stages during the execution of Epoxy Painting Works at project site. The equipment/tools
Read Complete Method