2021
Dec
19

Explosive Power Tools Operation Safety Instructions

Explosive Power Tools Operation Safety Instructions

The purpose of this safety procedure is to provide the safety requirements for the use of power actuated fastening tools. This Instruction applies to all applications where power actuated tools are used on a project. Always refer to the power tool operating

2021
Dec
5

Concrete Curing Method of Statement

Concrete Curing Method of Statement

The scope of this procedure covers methods of concrete curing to achieve specified strength and durability parameters of concrete. Procedure for concrete curing on a project site will vary depending on the type, exposure, location and design mix. It is advised to

2021
Nov
22

Drainage Accessories Installation Method of Statement

Below is a precise method of statement that describes the procedure for installation of Drainage Accessories. This document defines the methods to be used to ensure that the plumbing works to be conducted at site are in compliance with the approved designs

2021
Nov
9

Standard Procedure for Management of Construction Equipment Project Plant Assets

Standard Procedure for Management of Construction Equipment Project Plant Assets

This procedure describes standard procedure for Management of Construction Project Plant Assets. Project plant coordinator is overall responsible for the implementation of this procedure on the construction project. The asset management procedures describes the minimum requirements. Organization will only purchase assets when

2021
Oct
27

Office Safety Procedure for Workplace Safety Management

The purpose of this office hse procedure is to ensure that all offices are designed to mitigate risk and maintained to ensure the safety of staff and visitors. This office safety procedure is applicable for all kind of head/corporate/admin offices including project

2021
Oct
25

Road Maintenance Standard Requirements During Defect Liability Period

Possible Cause of Road Crack and Defect - Road Maintenance Inspection Guide

The road maintenance contractor shall be responsible for undertaking all routine maintenance of the existing road and all bridges on the road from the day the road is officially handed-over to the client until the issue of Defects Liability Certificate by the