Below is a precise testing and commissioning method statement for chilled water pumps on a project site. The purpose of this method of statement or standard operating procedure is to define the step by step method to implement the correct practices for
Read Complete Method
This method statement is applicable for all drainage pipe works underground, above ground, horizontal and vertical drainage piping for any kind of the project as specified in project specification. It is responsibility of project manager and project plumbing engineer to ensure the
Read Complete Method
Below is the standard procedure for the proper flushing of air-conditioning and refrigeration system with the use of dry nitrogen, and refrigeration equipment which require flushing of the system after exposing it to the atmosphere or during replacement of the refrigerant compressor. Responsibilities:
Read Complete Method
The purpose of this document is to lay down the systematic procedures for the various activities required for concrete formwork to ensure that all works are carried out in accordance with the approved shop drawings and contract specifications. This civil method statement
Read Complete Method
This standard work instruction describes the system to control potentially high risk operations through the issue of a Permit to Work (PTW). Procedure applies to all parties engaged under the control of main contractor on a construction project site. Permit to Work
Read Complete Method
Purpose of this procedure is to define the step by step method to implement the correct practices for the pre-commissioning & commissioning of chilled water pressurization unit through the guidelines contained herein so as to ensure that the job execution complies with
Read Complete Method
1. Purpose This Method statement covers the installation and final electrical connections to the MV and LV equipment at any electrical project site. All the electrical installation work will be in accordance with the project electrical specifications. 2. Scope of Work This procedure
Read Complete Method
This document is prepared to provide a clear explanation about PTW issuance and to exemplify the PTW required activities at a construction or any other kind of project, the process involves detailed risk assessments on site activities conducted by main contractor in
Read Complete Method