Fire Stop Work Installation & Application Method Statement

Method Statement for Installation of Fire Stop Work

Scope: This method statement covers the installation of Hilti Fire stop Wok which is also applicable for any other brand of fire stop system by integrating their specific requirements for effective fire stop application. References:  Approved Project Quality Plan Approved Project HSE

2021
Jul
30

Download Plumbing Risk Assessments Covering 22 Activities – Editable Format

plumbing risk assessment sample page

Now you can download complete set of risk assessments for the building construction plumbing works. The files are in editable word formats and you only need to add your company name project logo etc. Best suited for any kind of plumbing construction project.

2021
Jun
27

Download Lifting Operations Standard Method Statement in editable MS Word Format

Lifting Operations Method of Statement Download

Download Lifting Operations Standard Method Statement in editable MS Word format with all necessary forms and formats. You only need to add your company logo and project details etc. and your safety document is ready for submission and approval from client/consultant. This

2021
Jun
23

Method of Statement for Good Housekeeping in Construction Site

This standard document provides guidance on how to maintain a tidy place of work, free from avoidable hazards and an orderly working environment. Scope of the procedure covers all projects under the supervision of the organization. Project head along with discipline engineers

2021
Jun
17

Safe Operation of Abrasive Wheels / Power Tools For Cutting & Grinding

Safe Operation of Abrasive Wheels Power Tools For Cutting & Grinding

The purpose of this standard HSE procedure is to provide guidance on the safe operation and use of abrasive wheels used as high speed power tools for grinding and cutting operations on the construction sites or in the offices and house hold.

2021
May
30

Method Statement for Casting of Capping Beam for Shoring Piles

Method Statement for Casting of Capping Beam for Shoring Piles

The purpose and aim of this civil works method statement is to provide and maintain effective quality control procedures and to execute the capping beam work in compliance to standard and good practice at all stages and activities in the construction of

2021
May
18

Method Statement For Installation Of Stainless Steel Shower Gullies and Drain Outlets

Method Statement For Installation Of Stainless Steel Shower Gullies and Drain Outlets

This plumbing method statement covers the nature and type of work for drainage outlets stainless steel shower gullies for the project as per site requirements. Method statement also covers frequency of which inspections are to be carried out. All documentary requirements for