Download Lifting Operations Standard Method Statement in editable MS Word Format

Download Lifting Operations Standard Method Statement in editable MS Word format with all necessary forms and formats.

You only need to add your company logo and project details etc. and your safety document is ready for submission and approval from client/consultant.

This standard lifting activity instruction outlines the minimum requirements for the use, operation and maintenance of cranes.

It also defines the competencies required and responsibilities for the safe lifting operation of this type of industrial equipment.

These requirements apply to all projects where work involving, or tasks associated with, the use and operation of cranes takes place.

Additional control measures may be required depending on project specific and local country requirements.

Table of Content 

1.0 Purpose

2.0 Scope 

3.0 References 

4.0 Definitions and Abbreviations 

5.0 Responsibilities

6.0 Procedure

  • General
  • Communication
  • Training
  • Competency Verification
  • Lifting Operations
  • Crane Setup on Outrigger
  • Planning the Job
  • Operational Responsibilities – Cranes
  • Crane Operations in Windy Conditions
  • Controls and Lifting Gear
  • Use of Crane Hoisted Workboxes/Man Basket

7.0 Records 

8.0 Appendix

Below is list of documents, forms and formats which you shall receive immediately in your email in addition to the method statement.

Lifting Operations Standard Method Statement

F01- Lifting Equipment Inspection Report

F02- Crane Inspection Checklist

F03- Rigging Register

F04- ManCage or Workbox Permit

F05- Mancage or Workbox Checklist

F06- Lift Evaluation Form