The purpose of this method statement is to define the procedure for sequence of works for dewatering in construction works at site to complete the excavation from the existing levels down to the formation level considering all safety and quality requirements. This
Read Complete Method
This construction safety instruction provides two-fold direction to assist in preventing children from entering the construction / mining site and being exposed to harm and to prevent underage personnel from working on the project. Procedure is applicable for all kind of projects
Read Complete Method
Unless otherwise specified, all the dampers and duct accessories installation shall be according to the approved shop drawings and contract mechanical specifications. Drawings, plans, schematics and diagrams indicate general location and arrangement of ductworks, install the dampers as indicated unless deviations to
Read Complete Method
This method statement covers on site installation of all condensate UPVC pipes for fan coils drains and galvanized pipework for AHU drains, including supports, expansion and anchor points for the condensate drainage system and insulation of the galvanized steel and upvc pipework.
Read Complete Method
Busbars installation shall be done in accordance with approved shop drawings and properly coordinated with Site Engineer’s for the exact locations and levels. Before starting the installation of power electrical busbar following tools shall be arranged: Tower Crane / Fork Lift for
Read Complete Method
This testing and commissioning method statement defines the nature and method of Pre-Commissioning & Commissioning of Water Leak Detection System, which has been already installed and approved in the project. However, contractual terms and conditions shall be applied and enforced in case
Read Complete Method
The purpose of this procedure is to safely recover mobile equipment that may have been bogged, overturned, suffering from mechanical/structural failure, slipped over an edge or into a culvert, or similarly immobilized. It provides instruction for recovery operations that require the use
Read Complete Method
The purpose of this concreting method statement is to define the guidelines for the preparation of the concreting work for pedestrian walkway (broom finish) and to ensure the safe execution of all the concrete works during construction phases of the project so
Read Complete Method