2021
Oct
27

Office Safety Procedure for Workplace Safety Management

The purpose of this office hse procedure is to ensure that all offices are designed to mitigate risk and maintained to ensure the safety of staff and visitors. This office safety procedure is applicable for all kind of head/corporate/admin offices including project

2021
Oct
25

Road Maintenance Standard Requirements During Defect Liability Period

Possible Cause of Road Crack and Defect - Road Maintenance Inspection Guide

The road maintenance contractor shall be responsible for undertaking all routine maintenance of the existing road and all bridges on the road from the day the road is officially handed-over to the client until the issue of Defects Liability Certificate by the

2021
Oct
10

Excavation Work Guidelines for Irrigation and Water Supply Projects

Excavation Work Guidelines for Irrigation and Water Supply Projects

This excavation method statement serves as a guideline for the excavation works undertaken during the construction project. The process will include methods to carry out the excavation and surface preparation, in compliance with the applicable environmental and safety measures. Construction manager is

2021
Sep
28

Step Ladder Safety Procedure & Control Measures for Safe Work

A ladder is a simple, versatile and relatively inexpensive piece of equipment to use on a construction project or at home level. The temptation therefore is to use it for all sorts or work without considering whether the risk warrants an alternative

2021
Sep
19

Fixing of Non Swell Type Water Stop in Sub Structure Concrete Works

Purpose of this method statement is to define the fixing of the water stop in the sub structure concrete works as per the manufacturer’s requirements and drawings, considering all the necessary safety and quality aspects of the work activities. Project manager shall

2021
Aug
31

Concrete Bulging Repair Method Statement

Concrete Bulging Repair Method Statement

This civil method statement details general procedures to be followed for repairing work of concrete bulging elements by using a suitable material i.e. BASF’s Emaco S88C T. The method covers preparatory works, bulging repairs and curing. The scope of this civil work

2021
Aug
30

Download Electrical Risk Assessment for Project Electrical Works – Editable Formats for 44 Activities

Sample page of Electrical Risk Assessment for Project Electrical Works

Now you can download electrical Risk Assessments for Electrical Works in editable doc formats. These risk assessments are helpful for project HSE officers for any type of construction projects. These are mandatory requirements for attaching with each of the electrical method statement.

2021
Aug
2

Fire Stop Work Installation & Application Method Statement

Method Statement for Installation of Fire Stop Work

Scope: This method statement covers the installation of Hilti Fire stop Wok which is also applicable for any other brand of fire stop system by integrating their specific requirements for effective fire stop application. References:  Approved Project Quality Plan Approved Project HSE