Pre-construction meeting will take place to brief all requirements on the implementation of this firefighting method statement. All operatives will attend the Project Safety induction prior to commencing work on site. As a minimum requirement, daily toolbox talk will explain and discuss:
Read Complete Method
Below are basic sections that can form a good project quality plan for construction sites. 1. Introduction Construction Quality Control Plan (CQCP) for any kind of project is implemented to ensure that construction procedures are performed in compliance with the plans and
Read Complete Method
This health and safety procedure provides guidance and direction in identification of potential manual handing and lifting issues and prevention measures to help eliminate the risk of injury. Procedure addresses safety instructions for both projects and offices of the company, additional control
Read Complete Method
Below method covers the erection of the tank by joining the top and bottom portion through the welding procedure. Prior to the commencement of the works the lifting supervisor must ensure that all site personnel are adequately briefed on the contents of
Read Complete Method
Setting Out the Layout Refer to the final layout drawing prepared with reference to the actual demarcation, set back adjustments, final levels and other development works. Check if the site is cleaned and leveled properly by cutting or filling. Start the layout
Read Complete Method
The purpose of this procedure is to determine the abrasion of the given aggregate sample for road works. For conducting this test you shall need Los Angles Abrasion Machine, Steel balls, Weighing balance and sieves of different sizes i.e. 20, 12.5, 10, 1.7
Read Complete Method
This mechanical method statement covers the excavation, installation, jointing and backfilling of underground coated carbon steel piping. The pressure testing of all steel piping system will be conducted in accordance with applicable Hydrostatic Test Procedure. Roles and Responsibilities Project Manager is responsible
Read Complete Method
Below is a detailed method statement for thermal insulation application on pipes, fittings and equipment connections. Calcium silicate insulation is used for thermal insulation of indoor piping and fittings. Perlite insulation is often used where water entering an insulation system may cause
Read Complete Method