Risk Assessment Template and Risk Matrix Download Links

You can download hazard identification, risk matrix and risk assessment templates from below links. These are the templates that you can use for conducting the risk assessments for any kind of activities related to any industry like  manufacturing, production and construction etc. These risk assessment template files are in Word Document format .docx and you… Read More »

Method Statement for Wall Panel Installation

The purpose of this procedure is to define how the wall panel installation and fabrication at a construction site shall be carried out under the controlled conditions. Scope of work under this method statement covers the detailed procedure to be followed for fabrication, supply and installation of wall panels as per approved shop drawings and… Read More »

Common Risks Associated with Welding Process

As a mechanical engineer you are well aware that there are many types of welding processes, having different risks associated with them. On this page we shall mention the risks associated with electric arc welding, which is very common in the industries. Welding is safe profession if necessary protective measures are taken to safeguard the… Read More »

Occupational Health and Safety Procedure for Chemicals and Hazardous Substances

Below is an important workplace health and safety procedure related to COSHH, that details the requirements for the establishment and maintenance of local registers for the control of chemicals and hazardous substances. Project head in coordination with all site staff and HSE team is overall responsible to implement this procedure on a project. Project Managers… Read More »

Risk Management Principles Simple & Precise Explanation

Risk management as understood by its name is process of managing the risks, that involves first identify, assess and prioritize the risks and then implement the coordinated measures and/or resources to eliminate, minimize and monitor the probability and impact of the unwanted events or situations. Risk management is the identification, evaluation, and prioritization of risks (defined in ISO 31000 as the… Read More »

MV Switchgear Installation Method Statement

This method statement for installation of medium and low voltage switchgear and panels boards on site is prepared to define the method used to ensure that all MV/LV switchgear and panels site assembly, installation, final connection and workmanship is correct and acceptable and conforms to the contract documents & electrical specifications. The Project Manager is… Read More »

Driven Piles Installation Method Statement

The piling contractor shall submit to the consultant the piling forms and formats for approval prior to the commencement of piling works. Piling contractor shall maintain and provide all the record for each pile driven. Handling and Storage of Piles The piling contractor shall ensure that all piles are stacked correctly with timber being placed… Read More »

Mechanical Engineering Interview Questions and Answers

Below we have given around 70 questions and answers that can be helpful for mechanical engineer interview.  Q.1) What is the Unit of Heat? Units: BTU (British Thermal Units) 1BTU: It is the amount of energy required to raise 1 Degree Fahrenheit temperature of 1 Pound of water (OR) It is the amount of heat… Read More »