Split Unit Testing and Commissioning Method Statement

Below is a precise HVAC method statement that briefly explains testing and commissioning of split unit ac air conditioner. The test will be commenced after Split Unit installation and power supply panel T&C activities completed. All areas and fan inlet & outlet should be cleared of waste materials and any other obstruction. The purpose of… Read More »

Method Statement for Hot Insulation

This method statement covers the general requirements for materials and application of external thermal insulation on the hot surfaces of piping and equipment’s as applicable on the project or facilities i.e. boilers, refineries etc. The external surface of equipment, piping and machinery shall be insulated to conserve energy by reducing heat loss and to facilitate… Read More »

Standing Procedure For Liter Weight of Cement Clinker

Procedure For Liter Weight of Clinker The liter weight of clinker is a good measure of burn-ability by calculating the density of the clinker.  The size of clinker for liter weight is between 5 & 10 mm. A clinker of density approximately 1100 g/ltr is of normal quality, but below than that is not considered a good… Read More »

Exhaust Fan Installation Procedure ( Axial, Centrifugal and Propeller Exhaust Fans)

Below is a precise exhaust fan installation procedure that covers installation of Axial, Centrifugal and Propeller types of exhaust fans. This standing procedure step wise defines the method that will help to ensure that installation of axial / centrifugal / propeller fan’s, supports, vibration isolators and final connections is done as per project specifications. Also… Read More »

Method of Statement For Installation of Compressed Air Piping System for Chillers

1. PURPOSE This method of statement covers the on construction project site installation of the compressed air piping system for the operation of the chillers. This method statement covers following type of works: Power Plant Compressed Air Systems Factory assembled packaged air compressor complete with: –  Rotary screw air compressor –  Receiver –  Filtration facilities – … Read More »

Earth Retention Shoring System for Excavations – Part 2 of 2

Diaphragm & Guide Walls Requirements The design and construction of the diaphragm wall including all its associated works such as guide walls, anchors, etc., shall be the responsibility of the Contractor and shall take into account the actual site, ground conditions, the equipment to be used and the local authorities requirements/regulations. The design and construction of… Read More »

Earth Retention Shoring System for Excavations – Part 1 of 2

The work specified herein includes the design, documentation, furnishing, and installation of earth retention systems for excavations.  The earth retention system shall be either singular or multiple stages comprised of soldier piles and laggings, sheet pile wall and bracing, raker or timber sheet pile wall bracing or secant piling bracing and tie-back systems or cantilever… Read More »