Bulldozer and Excavator Track Replacement Standard Procedure

Bulldozer Grader and Excavator Maintenance and Track Replacement Standard Procedure

Below is the standard procedure that is helpful for project maintenance team for maintenance and track replacement for bulldozers and excavators. This instruction shall apply to all track replacement operations and other preventive maintenance actions for bulldozers, graders and excavators under the control of the contractor. General Requirements a) Clean the unit before service. b) […]

Bulldozer Grader and Excavator Maintenance and Track Replacement Standard Procedure Read More »

Civil Engineering Methods, Method Statements, Preventive Maintenance, Technical Articles
confined space entry hazards and training requirements

Confined Space Definition Entry & Working Procedure

The purpose of this safework method is to assist the organization in the identification and establishment of  standard procedure for the safe entry and work in confined space. This document addresses safety instructions for both projects and offices of the company. Additional health and safety control measures may be required depending on local legislation and

Confined Space Definition Entry & Working Procedure Read More »

Occupational Health and Safety, Risk Assessment, Technical Articles
Occupational Health and Safety Recognition Award Scheme

Occupational Health and Safety Recognition Award Scheme

This document describes the guidelines on the HSE recognition and awards scheme for a company or organization. Through the health and safety award scheme occupational safety and health administration recognizes efforts made by the employees, partners and sub-contractors in achieving high standards of Safety and Environmental Performance in their work. This safety recognition scheme has

Occupational Health and Safety Recognition Award Scheme Read More »

Occupational Health and Safety, Technical Articles

Construction Project Management Review TQM Procedure

Reviewing the performance of any project or organization is key to its success and growth. This is best practice to conduct management review meetings for agenda of continuous improvement. Any organization that implements total quality management or TQM on their processes and projects must establish a management review procedure for regular review of its progress

Construction Project Management Review TQM Procedure Read More »

Project Planning, Quality Management, Technical Articles

General Sequence of Works in Preparation of Building Foundation Up To The Level Of Blinding Concrete

The purpose of this article is to define the procedure for sequence of works in preparation for the foundation up to the level of blinding concrete, considering all safety and quality requirements. Preparation of foundation works at site involves water proofing, screed and casting of foundations including column and lift pit footings. Prior to commencement

General Sequence of Works in Preparation of Building Foundation Up To The Level Of Blinding Concrete Read More »

Civil Engineering Methods, Project Planning, Quality Management, Technical Articles
Control of Engineering Documents Procedure

Control of Engineering Documents Procedure for Quality Management System

This procedure describes the requirements on the control of engineering documents. This is an essential document control procedure that ensures all engineering drawings and related technical documents essential for completing the works, including shop drawings by vendors, manufacturers and subcontractors on Projects are duly registered, reviewed, approved and distributed in a controlled manner. Procedure of

Control of Engineering Documents Procedure for Quality Management System Read More »

Quality Management, Technical Articles, Templates

Lock Out Tag Out LOTO Construction Safety Isolation Procedure

This lock out tag out procedure shall help companies to establish a standard for the safe isolation of machinery, equipment and any other energy source which may need isolation by means of a lock-out tag-out LOTO system. Overall the project head / project manager is responsible for the implementation of this standard  hse procedure as

Lock Out Tag Out LOTO Construction Safety Isolation Procedure Read More »

Occupational Health and Safety, Technical Articles
Construction Project Management and Methodology

Method Statement for an EPC Construction Project

This method statement for construction project consists of the following sections. 1. General Execution Strategy 2. Details of Design and Engineering Plan 3. Material Management Planning and List of Long Delivery Material 4. Construction and Installation Activity 5. Safety and Environmental Plan 6. Quality Assurance Planning Section 1. General Execution Strategy Contractor will be responsible

Method Statement for an EPC Construction Project Read More »

Civil Engineering Methods, Method Statements, Project Planning, Quality Management, Technical Articles