2020
Jun
5

General Sequence of Works in Preparation of Building Foundation Up To The Level Of Blinding Concrete

The purpose of this article is to define the procedure for sequence of works in preparation for the foundation up to the level of blinding concrete, considering all safety and quality requirements. Preparation of foundation works at site involves water proofing, screed

2020
Apr
10

Control of Engineering Documents Procedure for Quality Management System

Control of Engineering Documents Procedure

This procedure describes the requirements on the control of engineering documents. This is an essential document control procedure that ensures all engineering drawings and related technical documents essential for completing the works, including shop drawings by vendors, manufacturers and subcontractors on Projects

2020
Apr
1

Lock Out Tag Out LOTO Construction Safety Isolation Procedure

This lock out tag out procedure shall help companies to establish a standard for the safe isolation of machinery, equipment and any other energy source which may need isolation by means of a lock-out tag-out LOTO system. Overall the project head /

2019
Nov
28

Method Statement for an EPC Construction Project

Construction Project Management and Methodology

This method statement for construction project consists of the following sections. 1. General Execution Strategy 2. Details of Design and Engineering Plan 3. Material Management Planning and List of Long Delivery Material 4. Construction and Installation Activity 5. Safety and Environmental Plan

2019
Aug
20

Software Quality Assurance Framework & Methodologies

Software Quality Assurance Methodologies

In this article you shall understand: What is Software Quality? What is Software Quality Assurance? Components Of Quality Assurance Software Quality Assurance Plan Quality Standards Now lets see all these topics in more detail. 1. What is Software Quality? According to computer