Category Archives: Civil Engineering Methods

Civil engineering is the core business of any construction company that works as a civil contractor. Our website provides best resources for civil engineering profession.
Civil construction engineers can download construction methodology , method statements covering ITP, check lists and risk assessments.
All our civil engineering documents are editable hence fulfilling the construction industry requirements, and helping engineers to grow in their engineering career.

Standard Road Maintenance Routine Requirements

The works mentioned in this Section shall apply to maintenance of road and shall be carried out manually or by machinery in such a way that the quality of end product meets the specified requirements. Whenever the Specification is not clear, good engineering practice shall be applied to the satisfaction of the consulting engineer. This… Read More »

Explosive Power Tools Operation Safety Instructions

The purpose of this safety procedure is to provide the safety requirements for the use of power actuated fastening tools. This Instruction applies to all applications where power actuated tools are used on a project. Always refer to the power tool operating manual and cartridge operating manual. Hazard Identification and Risk Assessment The introduction of… Read More »

Concrete Curing Method of Statement

The scope of this procedure covers methods of concrete curing to achieve specified strength and durability parameters of concrete. Procedure for concrete curing on a project site will vary depending on the type, exposure, location and design mix. It is advised to check the specification and obtain the approval of the Consultant prior to the… Read More »

Standard Procedure for Management of Construction Equipment Project Plant Assets

This procedure describes standard procedure for Management of Construction Project Plant Assets. Project plant coordinator is overall responsible for the implementation of this procedure on the construction project. The asset management procedures describes the minimum requirements. Organization will only purchase assets when suitable hire/rental equipment is not available in the market place, and where an… Read More »

Road Maintenance Standard Requirements During Defect Liability Period

The road maintenance contractor shall be responsible for undertaking all routine maintenance of the existing road and all bridges on the road from the day the road is officially handed-over to the client until the issue of Defects Liability Certificate by the engineer. Contractor shall also carry out all the routine maintenance of the completed… Read More »

Excavation Work Guidelines for Irrigation and Water Supply Projects

This excavation method statement serves as a guideline for the excavation works undertaken during the construction project. The process will include methods to carry out the excavation and surface preparation, in compliance with the applicable environmental and safety measures. Construction manager is responsible in ensuring the implementation of construction procedure and method statement, supervising the… Read More »

Fixing of Non Swell Type Water Stop in Sub Structure Concrete Works

Purpose of this method statement is to define the fixing of the water stop in the sub structure concrete works as per the manufacturer’s requirements and drawings, considering all the necessary safety and quality aspects of the work activities. Project manager shall ensure that the water stop works are carried out in accordance with company… Read More »

Concrete Bulging Repair Method Statement

This civil method statement details general procedures to be followed for repairing work of concrete bulging elements by using a suitable material i.e. BASF’s Emaco S88C T. The method covers preparatory works, bulging repairs and curing. The scope of this civil work method statement is for rectification of the bulges in concrete in which chipping… Read More »